John's Blog
Home
Custom Homes
Building Sites
Remodeling
Green Building
Energy
Testimonials
Awards
About Us
Company Profile
Contact Us
Awards
Industry Leadership
Community Involvement
Kurowski Partners
Support-A-Platoon
Race Street Remodel
Click on photos to enlarge:
Under Construction
Shower pan is installed and protected
Plumbing and electric above future sink
Shower seat is framed with slope for drainage
Shower valve is installed
Quiet Panasonic fan is installed
Plumbing under future sink
Bathroom walls are framed
Top plates are attached with screws for greater strength
Floating walls with Timberstrand bottom plates
Old walls are reinforced with anchor bolts
New closet walls are framed
A lot of existing pipes above new closet
Waste pump pit
Trench is filled with concrete
Foundation drilled for waste pump lines
Trench is reinforced with rebars
Trench is backfilled after inspection
Underground plumbing is finished
Broken drywall loaded in bags
Drywall removed for future bathroom
Drywall removed where needed
Work area behind plastic barriers
Future walls are marked on floor
Railing is protected
Kitchen hardwood floor protected
Garage floor protected
Before
South wall with door to crawlspace
General location of new bathroom on south wall
Door on north wall to crawlspace