John's Blog
Home
Custom Homes
Building Sites
Remodeling
Green Building
Energy
Testimonials
Awards
About Us
Company Profile
Contact Us
Awards
Industry Leadership
Community Involvement
Kurowski Partners
Support-A-Platoon
Red Deer
Mudroom Addition in Garage
Click on photos to enlarge:
Mudroom completed and cleaned
Cleaned and ready for use
Kitchen and hall to mudroom cleaned
Garage cleaned
Ready for final cleaning
New lights installed
View from new bench seat
Finished paint
Finished paint
Masking in place
Painters preparing to paint
in installation complete
in set in place
Installers checking the fit
in cabinet carefully wrapped for delivery
in cabinet
Baseboard trim partial installation
Tile installed with spacers
Tile installation
Tile being cut to fit
Tile support mat installation
Texture complete
Foam insulation around door frame
Drywall ready for texture
New opening to mud room
Paul setting door
Inside complete & ready for inspection
Drywall in garage being completed
Cutting out drywall for the switches
Cutting the drywall
Drywall hanging
Doors taped for dust control
Installing dust control plastic
Net & blow insulation completed (R29)
3" foam in 2x4 original framing
3" in existing window wall (R21) & 2" in 2x6 wall (R14)
No insulation around the door jamb from original construction
Technican suited up for protection during the spray foam process
Chemical mixing equipment
Foam insulation truck
Insulator covering window before foam insulation
Garage side drywall being completed before insulation
5/8" fire sheetrock on garage walls
Window trimmed & caulked
Garage side drywall being completed before insulation
Existing attic installation
Window sealed to the drainage plane
Tape flashing over window flanges
Continued tape flashing before window placement
Window framing open
Paul installing tape flashing prior to window installation
Rough window framing
Paul framing the window opening
Removing drywall for window
Existing wall before window
Work area cleaned
Electrician drilling plates for wiring
OSB on wall for additional corner support
Concrete cut lines caulked
Ledger locks to secure top plate to truss above
Straps for additional corner support
Walls being framed
Subfloor installed
Diagonal braces in place to support the corner
Ridged insulation in place on floor before fiberglass blown insulation
Waterproofing complete
Waterproofing in progess
Floor framing in progress
Santizing station in place
Site organization
Floor framing in progress
Pavel starts framing
Clean up complete
Finished floor & pier
Wheeling concrete into garage
Computerized site mixed concrete
Start dirt disposal
Pier and floor ready to pour
Bottom of hole is clean
Finished pier hole
Tape measure showing the hole depth
Auger into the bottom of the hole
inch auger drilling 50 inches below existing slab
Concrete removed
Wet sawing and vacuum
Sawing floor concrete
Floor sawing trade contractor
Plastic protection
Base and case & texture to match existing
Trim and siding to match existing
View the new mudroom window will have
Location for new window
Existing exterior
Existing door to garage
Existing stairs & door to house
Existing garage