John's Blog
Home
Custom Homes
Building Sites
Remodeling
Green Building
Energy
Testimonials
Awards
About Us
Company Profile
Contact Us
Awards
Industry Leadership
Community Involvement
Kurowski Partners
Support-A-Platoon
Quitman Phase 1 Garage
Click on photos to enlarge:
Martha's pretty handprint & date
Fence installation at north property line
North fence posts being installed
South fence holes dug
New walk & curb protection
New walk & driveway entrance
Placing concrete in ROW new walk
Placing concrete in city's Right of Way (ROW)
Loading concrete into trailer to recycle
Existing concrete driveway demolition
Removing debris
Lifting slab
Preparing to lift slab
Breaking concrete in existing driveway with hydraulic hammer
Removing insulation blankets
Sunny, warm & 53 degrees
Driveway approach
Accessible pad
Insulated blankets removed from new sidewalk
Safety control cones
Old driveway to be removed
Leveling concrete
Placing concrete around tree root drains
Placing & vibrating concrete
Placing & vibrating concrete
Concrete delivery trucks
Tamping road base after wetting
Cleaning tamper plate - area to the right has been wetted and tamped
Adding road base
Tree drains in place to catch water for tree roots
Doweling steel into foundation wall
Cutting exact grades
Forms for man door walkway
Forms set
Line pump for concrete
Line for added walk to patio
Driveway prep
Digging in drainage pipes
Insulated attic access cover to be installed
Thanks to Keith, the Master Mason
Stone started
Interior is ready for paint
Interior is ready for paint
Interior is ready for paint
Exterior paint completed
Exterior paint in progress
Exterior paint in progress
Exterior paint starting
Siding caulked
Roof in progress
Installing roof
Roof with ice & water shield
Roof is stocked
Roof being stocked
Garage door & opener are installed
Base trim added
Drywall finishing
Drywall finishing
Electric heater & door sealed for better drywall application & drying
New garage floor is protected & drywall installed
Initial smoothing of the surface with float
Initial smoothing of the surface with float
Leveling concrete
Crew spreading concrete
Lifting wire into concrete
Lifting wire into concrete
Concrete being placed
Wire in concrete
Concrete truck operator
Rowlock flashing for stone drip edge
Trim starting on east wall
North wall trim detail
Window flashing
Window flashing details
Window flashing details
First row of siding installed
Scaffold set for siding
Scaffold for fascia & soffit
Prep garage floor with perimeter insulation
Wall insulation being installed
Rigid insulation cut to fit garage perimeter
Two inch R-13.1 rigid insulation
Soffit vent holes
Insulation baffles in place for attic blown-in insulation
Wall insulation delivered
Area marked for concrete cutout
Electrical trench to garage
Trenching for electrical
House wall marked for electric J-box for fence gate
Conduit and J-box for gate
Sidewalk safety measures
Sidewalk safety measures
Sheathing almost complete
Nailing off roof sheathing
Trusses in place
Roof trusses ready to place OSB
Single truss placement
Rear gable end being set
Boom truck in place
Truss gable end assembled and ready to set
Trusses delivered
Truss delivery truck
OSB sheathing for roof
Structure is ready for trusses
Wall bracing for setting trusses
Sheathing ready for inspections (nails)
Insulation space at window header
Garage door header with insulation space
Window and door openings framed
Framed wall north wall sheathed
Exterior north wall after sheathing
West exterior wall sheathed
South wall sheathed
South wall before wall sheathing
Driveway road base being graded
Driveway road base being placed
Driveway road base being leveled
Driveway road base being placed
Compacting backfill
Compacting backfill
Backfill half way
Adding fill in the garage
Plates on south wall
Joints bolted on both sides
South wall bolts within 10 inches of the end of the plate
Sill sealer foamed in place
Bolts & 3-inch square washer being installed
Bolts & 3-inch square washer being installed
Bolts & 3-inch square washer being installed
10 inches x one-half inch expansion bolts for bottom plates
Details for engineer
Details for engineer
Bottom wall plates being placed
Lumber pack delivered
Checking top of foundation level
Top of wall before grinding
Stripping forms
Bolts being set after wall in place
Concrete before leveling
Placing concrete into forms
Pump set up
Concrete arrival at site
Final steel adjustments
Walls braced before concrete placed
Walls braced before concrete placed
Steel top row to top of wall
Steel in walls
Interior forms being placed
Exterior forms being placed
Bollards in place to protect gas meter
West wall ties before steel
Steel in place on south wall
Completing exterior panels
Setting forms
Panels laid out
Finishing top of footing
Pumping last section
Pumping concrete into forms
Pumping concrete into forms
Line pump in place
Concrete company
Concrete arrival
UFER measurement
UFER measurement
Vertical rebar being placed
Rebar cross bars
Rebar placement
Forms in place
Installing forms
Start of forming
Footing forms being set
Footing materials being off loaded
Installing waddles for erosion control
Installing waddles for erosion control
Top of foundation is set by surveyors
Staked - ready for excavation
Rear southwest property corner being pinned
Survey crew setting north rear property corner pin
South side toward new garage location before excavation
Street facing new driveway before excavation
North property line before excavation
Existing driveway
Front elevation before