Olive Street
Click on photos to enlarge:
Steel in mailbox footing
Mailbox base being formed
Sidewalk placed
Sidewalk placed
Sidewalk placed
Sidewalk freshly placed
Sidewalk placed with brick ledges
Sidewalk placed with brick ledges
Sidewalk placed with brick ledges
Steel placed in sidewalks
Entry walk form
Entry walk form in progress
Sidewalk marked
Sidewalk marked
Freshly placed concrete patio
Placed concrete being vibrated
Placed concrete being vibrated
Placing concrete
Placing concrete
Placing concrete with line pump
Concrete delivery (small concrete pump)
Forms covered for moisture & frost protection
Rough-in for light fixture
Flower pot drain on other side
Flower pot drain
Old door removed
Reinforcement drilled into foundation concrete
Rebar reinforcement
Rebar reinforcement
Forms in progress
Forms & steel going in
Vycor over new rim board & waterproofing
Added new rim board & flashing
Added new rim board, poured sealant, & flashing
Old caisson
Removing soil before compaction
Beginning excavation
Layout for new porch
View of demolition from garage
Roof metal shingles saved
Roof removed
Brick courses out of plumb
Bricks saved
Bricks removed to accept new entry door
Brick removed to accommodate new entry door
Concrete on existing brick
Entry threshold to be removed
Porch demolition
Demolition in progress
Before - New garage doors to match battens above
Before - Steel coated shingles
Before - Existing entry door
Before -Front elevation