downspouts connected to underground discharge pipes
connecting d-spout to wood column support to extend water away from sidewalk
new gutter on new addition (south)
new gutter on south section of existing home
new gutter on west side
hole for downspout column support
knocked down texture
windows are wrapped with drywall
finished drywall in mud room
landing in garage
Hardi-Backer tile underlayment
hallway will have heated floor
new gas line for addition
bad pieces of siding were replaced
siding around new kitchen window
vertical siding on mud room is finished
new siding is primed
painters priming new siding
newly finished storage area
new mechanical room
heat supply duct protection
cement board used at shower walls
accessible shower floor
master tub area
return air ducts protected and temporarily filtered
attic insulation in progress
master bedroom is drywalled
headers insulated with closed cell foam
top plate is caulked to prevent air leakage
top plate caulk before drywall for improved air control
air baffles for ventilation
upper knee wall insulated with closed cell foam
exterior walls insulated with closed cell foam & prep for net & blown fiberglass
foam behind all outlets to prevent air & moisture leakage
installing ridge vent for proper attic ventilation
ice & water for better moisture control
preparing for ridge vent installation
solar panels for electrical generation
excellent roof underlayment and start of shingles
mudroom floor is insulated with closed cell foam
floor cantilever is insulated with closed cell foam
inspection of cantilever prior to insulation
sealed heat register for better air delivery
new high efficient furnace is installed
drains in mechanical room
sealed ducts for better air deliver (mech room)
main duct in basement
upper vertical siding
rough electrical
lower cold air return
upper cold air return
bath vanity electrical & plumbing
Panasonic bathroom fan
laundry room plumbing
connection of existing & new septic lines
new septic line in backyard
new septic line clean outs
new mudroom door with transom
mudroom door will be installed over sealant
little roof is covered with ice & water shield
concrete placed for step into new mudroom against Vycor flashing
patio repair after new septic line
new mechanical room floor
siding is attached to studs
DOW house wrap & Vycor window flashings
new large kitchen window is installed
12 inch horizontal siding
steel columns installed
double basement walls to insulate foundation
2nd layer of Vycor flashing over window flanges
fire sprinkler system
accessible curbless shower pan
access in drywall to install fire sprinklers
existing small kitchen window
existing kitchen window will be replaced
mechanical drains before concrete placement
post footings being placed with concrete
fire sprinkler pipes
lower level door is installed
septic line is sealed to foundation
view of addition from southeast
new windows in bedrooms
windows in new master bedroom
attic transition between exisitng & new
attic access is framed with an insulation retaining barrier
mudroom & hallway ceilings
soffit above master shower
new septic line below patio
wall between existing home & addition is insulated
bsmt walls framed with gap next to fndtn for improved insulation system
rebars for post footings
new kitchen door & laundry window are installed
concrete patio is cut for new septic line
new mechanical room floor is cut for new drain
basement slab is cut for new post footings
old cracked sidewalk is removed
large & high windows are installed from scaffold
old trusses repaired with plywood gussets
master bedroom windows are installed
concrete in front of mud room is removed
Energy Star windows
energy efficient windows
north windows are installed
underlayment goes high on head wall for better moisture control
dried in roof
with Vycor we use Vinyl corners
new windows installed over first layer of Vycor
roof shingles were delivered
Richard is sheathing last part of roof
east part of roof is framed with cut rafters
we matched old and new roofs perfectly
we had to remove more ceiling and insulation
new floor between old house and addition
new mechanical room replaces old chimney
old floor joists were shimmed to level them
old subfloor was removed in order to level it
old exterior walls and chimney are demolished
new floor in place of old chimney
we matched old and new floors without step
concrete is poured in mudroom below joists
laundry wall is insulated
roof on adition is sheathed
hardwood floor removed
chimney demo complete
last part of chimney is demolished
chimney demolition continues
deck is protected during chimney demo
solar panels protected, roof covered
demo of chimney in progress
chimeny demo started
existing chimney cap
rake wall in master bedroom
interior corners are open for insulation
exterior corners are open for insulation
2x6 knee walls next to attic are sheathed
LVL headers are open for insulation
interior walls are framed
view from southwest
view from northwest
trusses being lifted by crane
roof trusses are assembled on ground
spray foam under rake wall
rake wall had to be built in two sections
upper walls are set over spray foam
spray foam below wall plates for air control
roof trusses are delivered
first wall standing
first wall framed on floor
plywood subfloor, not OSB
walls checked by string lines
LVL headers
new floor & steel beam are in place
new floor cantilevers on the north side
sill plates are installed over spray foam
spray foam under sill plates for air infiltration control
rebars installed in foundation blocks
foundation blocks are filled per engineer
foundation blocks are filled per engineer
foundation blocks are filled per engineer
foundation blocks are filled per engineer
foundation blocks are filled per engineer
temp covering for weather protection
demolition of old addition is complete
10 inches of rain overnight
historic floods
95th street flooded
old steel beam is gone
old roof & upper walls are removed
demolition inside old shop
roof shingles being stripped
demolition has begun
filteration venting for asbestos removal
filteration venting for asbestos removal
filteration venting for asbestos removal
protection for asbestos removal work
view from north
view from northwest
view from southwest
view from south
view from northwest