Wolf Addition
Denver, CO
Complete
|
|
|
Barrel Ceiling to Master Bath
|
|
|
|
Master Shower with 2 Different Types of Glass
|
|
|
|
Master Tub at Corner Windows
|
|
|
|
|
Second Master Vanity
|
|
|
|
One of Two Master Vanities with Vessel Sink
|
|
|
|
Finished Ceiling and New Fan Over Stairs
|
|
|
|
|
Oval Mirrors Over Vanity in Main Floor Bath
|
|
|
|
Two Shades of Purple - Main Floor Bath
|
|
|
|
White Cubbies Against Vibrant Colors in Mudroom
|
|
|
|
|
Crown Moulding & Curved Wall in Family Room
|
|
|
|
New Carpet & Paint at Existing Stairway
|
|
|
|
View from Family Room Out Front Window
|
|
|
|
|
View of Rear Elevation - Note the Three Sun Tunnel Domes
|
|
|
|
Side View of Master Deck & 12:12 Pitched Roof
|
|
|
|
Completed Front Elevation
|
|
|
Work in Progress
|
|
|
Glass Block at Stairwell and Common Wall to New Master Suite
|
|
|
|
Retrofit Solar Tube at Existing 2nd Floor Bath
|
|
|
|
Vanity with Vessel Sink & Faucet, Blue Tape to Mark Towel Ring Locations
|
|
|
|
|
Corner Vanity in Main Bath
|
|
|
|
Cubbies & Lockers, Glass Black at Mudroom, Blue Tape for Hooks
|
|
|
|
East End of New Family Room Nearing Completion
|
|
|
|
|
Priming at Exterior Rails at New Front Porch
|
|
|
|
Exterior Rails Complete, Prep & Prime Underway
|
|
|
|
Rail and Post Details Matched & Tied to Existing Front Porch
|
|
|
|
|
Exterior View of South Wall & Rails being Installed
|
|
|
|
New Stucco Over Existing Wall - NE Corner of Old House
|
|
|
|
Completed Wall Finishes at South Wall of Addition
|
|
|
|
|
Prep and Mask Trim for Oil Based, Spray Applied Primer
|
|
|
|
Master Vanities to be Set - Tub at Southeast Windows in Background
|
|
|
|
Master Closet Shelves Completed at South Closet
|
|
|
|
|
View from Master Bedroom - New Trim Ready for Paint
|
|
|
|
Trim Around Acrylic Blocks from Mudroom to Main Bath
|
|
|
|
Grout Application at Master Shower
|
|
|
|
|
|
New Stucco at Existing North Wall
|
|
|
|
Siding & Stucco Complete, Roofing in Progress at East Elevation
|
|
|
|
ARG Masonry Mechanic Troweling on Stucco
|
|
|
|
|
Stucco Trim at Windows & Vinyl Siding Complete - South Wall
|
|
|
|
Tyvek Wrap at Siding Areas
|
|
|
|
Old Siding Exposed, Prep for New Vinyl Siding
|
|
|
|
|
Skim Coat Complete at East Wall
|
|
|
|
Skim Coat at Existing Masonry Walls
|
|
|
|
Window Trim & Mesh Installation at South Wall
|
|
|
|
|
Tub Apron & Tile in Progress
|
|
|
|
Tile at Shower and Window Over Tub
|
|
|
|
Tile at Master Shower
|
|
|
|
|
Tile in Progress with George & Pat
|
|
|
|
Interior Trim Stocked
|
|
|
|
Hardwood Floor Patch - Old to New
|
|
|
|
|
Vinyl & Colored Primer Complete at Mudroom
|
|
|
|
Stair Wall Glass Block Opening
|
|
|
|
New Drywall at Existing Laundry
|
|
|
|
|
|
Barrel Vaulted Ceiling at Master Bedroom Hall
|
|
|
|
Future Deck in Progress
|
|
|
|
Drywall in Progress - Note the Number of Screws at Rounded Corner
|
|
|
|
|
Added Window to East Wall of Existing Laundry Room
|
|
|
|
Acryllic Block Window and Frame - Main Level Bath
|
|
|
|
Blown Insulation at Wall, Partial Batts for Blown Insulation Stop at Future Attic Install
|
|
|
|
|
Batt Insulation at Inaccessible Ceiling
|
|
|
|
Blown Cellulose Insulation Complete with Vapor Barrier
|
|
|
|
Blown Cellulose Insulation Complete with Vapor Barrier
|
|
|
|
|
|
New Pex Water Pipe at Old Laundry Area
|
|
|
|
New Shower Drain at Old Bath, Circa 1918. Badly Cut Joists to be Repaired as Possible
|
|
|
|
Electrical Home Runs Back to New Service Panel
|
|
|
|
|
Airtight Recessed Cans Noted by Orange Label
|
|
|
|
HVAC Material Ready to Demobe
|
|
|
|
Underground Main to Xcel Power Pole - Old Service was Overhead
|
|
|
|
|
Quickflash to be Installed at Electric Penetrations
|
|
|
|
Fascia & Soffit at South Side
|
|
|
|
Fascia Complete and Roof Dried On
|
|
|
|
|
|
Rear Elevation - Holes Cut for Sun Tunnels
|
|
|
|
Initial Deck Framing
|
|
|
|
Front Elevation Ready for Deck
|
|
|
|
|
Windows Set - Ready for Soffit & Fascia
|
|
|
|
First Window Set - Others Flashed with Vycor
|
|
|
|
Opening from Addition to Existing Home Nearly Complete
|
|
|
|
|
Site Discovery at Existing Bath Floor - Repair in Progress
|
|
|
|
Job Site Cleanup - Windows Stored Inside
|
|
|
|
Treated Cribbing & Support for Masonry Repair
|
|
|
|
|
|
Existing Conditions Exposed for 2nd Wall Information
|
|
|
|
Progress Work to Uncover Existing Roof Conditions
|
|
|
|
Progress Cleanup
|
|
|
|
|
Eddy - Job Foreman for Frame Crew
|
|
|
|
Opening for Future Header at Masonry Wall
|
|
|
|
Old Existing Bath Floor - Demo with Old OSB
|
|
|
|
|
2nd Subfloor and Sheathing Complete
|
|
|
|
East Wall of Mudroom & Tie to Existing Construction
|
|
|
|
New Post to I Beam for Existing 2nd Floor
|
|
|
|
|
1st Floor & Walls Complete
|
|
|
|
Truss Match at Existing Roof with Diifering Pitch at Rear
|
|
|
|
Sister Wall Block Out for New Plumbing
|
|
|
|
|
Poured Sister Wall
|
|
|
|
Addition Foundation Stripped - Ready for Dampproofing
|
|
|
|
2nd Floor Laundry Walls with Temp Post & Bracing
|
|
|
|
|
New Foundation to Encapsulate Old Masonry
|
|
|
|
Sister Wall Formed at Existing House
|
|
|
|
Foundation Forming - South & East Walls
|
|
|
Excavation & Foundation
|
|
|
South & East Forms in Progress
|
|
|
|
Steel Detail at Future Sister Wall
|
|
|
|
Forming at Old Masonry. Note the Holes Thru Existing Masonry
|
|
|
|
|
Masonry Foundation to get a Sister Wall
|
|
|
|
Excavation Completed. Abandoned Soil Pipe
|
|
|
|
Old Basement Window Frame
|
|
|
|
|
Old Bearing Left for 2nd Floor
|
|
|
|
Board Up at Remaining Crawlspace
|
|
|
|
Old Masonry Foundation, Circa 1918
|
|
|
Progress Demolition
|
|
|
Old Rear Entry & Hall
|
|
|
|
Remedial Work Needed at Old Opening
|
|
|
|
Owner & Engineer in the Midst of the Spoils
|
|
|
|
|
Demo Saw Front Porch for Removal
|
|
|
|
SE Corner Ready for Temp Braces
|
|
|
|
Mechanical Brace During Demo
|
|
|
|
|
Unforseen Crawlspace Under Main Bath
|
|
|
|
Same Area from East Side
|
|
|
|
Minimal Support for 2nd Floor
|
|
|
|
|
Breakout Old Concrete Patio
|
|
|
|
Final Area to be Removed
|
|
|
|
Demo at 80% Complete
|
|
|
|
|
Uncover Old Plumbing & Electrical
|
|
|
|
Sunroom Demo & Old South Wall
|
|
|
|
Partial Post & Rail Demo at Deck
|
|
|
Pre-Demo & Discovery
|
|
|
Start Removal of Swamp Cooler
|
|
|
|
Flashing at Chimney is Removed
|
|
|
|
Partial Panel Removal at Sunroom
|
|
|
|
|
Old Exterior Wall & Window
|
|
|
|
Same Opening Showing Distress
|
|
|
|
Inadequate Support at Opening
|
|
|
Existing Conditions
|
|
|
Wires & Fence to be Redone
|
|
|
|
Furnace to be Reused for Main Floor
|
|
|
|
Cut Joists to be Remedied During Remodel
|
|
|
|
|
Ductwork with Asbestos Tape, Pre-Demo
|
|
|
|
Deck on West Side, Part of Demo
|
|
|
|
Old Sunroom to be Demolished
|
|
|
|
|
2nd Floor Bath, Half to be Removed
|
|
|
|
Existing Main Floor to Remain, As Is
|
|
|
|
1st Floor Addition to be Demolished
|
|
|
|
|
SE Corner, High Gable to Remain
|
|
|
|
South Area of Demo
|
|
|
|
Existing Home - RH Side to be Demolished
|
|
|
|