|
|
|
Bathroom Shower
|
|
|
|
Living Area
|
|
|
|
Game Room
|
|
|
|
|
Exercise Room
|
|
|
|
Bedroom
|
|
|
|
Drywall Finished
|
|
|
|
|
Drywall Delivered
|
|
|
|
Temp Filter Over Cold Air Return
|
|
|
|
Insulation Technicians at Work
|
|
|
|
|
Truck with Machine for Blowing Insulation
|
|
|
|
Cellulose Insulation Delivered
|
|
|
|
Low Voltage Wiring
|
|
|
|
|
Low Voltage Wires Installed
|
|
|
|
Can Lights Installed
|
|
|
|
Firestops in Perimeter Walls Installed
|
|
|
|
|
Steel Column is Wrapped
|
|
|
|
Mechanical Room Wall is Framed
|
|
|
|
Firestops Installed
|
|
|
|
|
Firestop in Dead Space
|
|
|
|
Ceiling Joists are Supported with Blocks
|
|
|
|
Angled Soffit by Entry to Basement
|
|
|
|
|
|
Game Room
|
|
|
|
Exercise Room
|
|
|
|
Recreation Room
|
|
|
|
|
Shower Pan Installed
|
|
|
|
Bathroom Plumbing
|
|
|
|
Bathroom Fan Installed
|
|
|
|
|
Closet and Soffit in Bedroom
|
|
|
|
Soffits in Living Area
|
|
|
|
Duct Works are Sealed
|
|
|
|
|
New Heat Run in Extended Living Area
|
|
|
|
New Heat Run in Exercise Room
|
|
|
|
Framing Almost Finished
|
|
|
|
|
Ceiling Joists are Braced to Keep Drywall Straight
|
|
|
|
Ceiling Joists are Blocked to Keep Them from Twisting
|
|
|
|
Notched Ceiling Joists for Maximum Ceiling Height
|
|
|
|
|
Floor Protection from Garage into House
|
|
|
|
Floor Protection from Front Entry
|
|
|
|
Floor Protection at Front Entry
|
|
|
|
|
Garage Entry Information Signs
|
|
|
|
Entry Door Information Sign
|
|
|
|
Driveway Protection Sign
|
|
|