|
|
|
Future Tile to be Flush with Hardwood
|
|
|
|
Recessed Can Added to Ceiling Through Attic
|
|
|
|
Durock Used as Floor Underlayment
|
|
|
|
|
Wall Patches Textured and Ready for New Tile
|
|
|
|
Durock & Drywall Patches Partially Complete
|
|
|
|
Insulation and Shower Valve Ready for Durock
|
|
|
|
|
New 5 ft Shower Base
|
|
|
|
Copper Supplies Used for Future Connections
|
|
|
|
Old Galvanized Water Pipe will be Coverted to Pex Tubing
|
|
|
|
|
Insufficient Framing Uncovered at Old Tub Area
|
|
|
|
Concrete Block at Exterior Wall & Old Joists
|
|
|
|
Demo in Progress
|
|
|