|
|
|
Southeast View
|
|
|
|
Front Elevation
|
|
|
|
View from Northwest
|
|
|
|
|
View from West
|
|
|
|
View from Garden
|
|
|
|
Rear Elevation
|
|
|
|
|
Covered Rear Porch
|
|
|
|
Rear Elevation View from the South
|
|
|
|
Light Shelf for Shading
|
|
|
|
|
View of Kitchen and Skylight
|
|
|
|
Kitchen Skylight Shaft Reflective Slope
|
|
|
|
View of Kitchen
|
|
|
|
|
Great Room View into Sun Room with Operable Glass Isolation Wall
|
|
|
|
Laundry Room with Energy Star Rated Washer and Dryer
|
|
|
|
Sun Room with Operable Windows and Transoms
|
|
|
|
|
Basement Sun Space
|
|
|
|
Heat Recovery & Air Filtration System
|
|
|
|
Radiant Heat System
|
|
|
|
|
|
The Woodhaven - Final Touches being Made
|
|
|
|
Partial Front from Across the Street
|
|
|
|
View of East Elevation from Neighbor's Dirve
|
|
|
|
|
View of SW Corner from HOA Park
|
|
|
|
Rear Elevation
|
|
|
|
Potting Bench and Epoxy Finish at Garage Slab
|
|
|
|
|
High Efficiency Washer and Laundry Sink
|
|
|
|
Adjustable Shelf Unit in Mudroom
|
|
|
|
Library Shelves - Soon to be Filled
|
|
|
|
|
Library Cabinets and Storage
|
|
|
|
Library Desktop
|
|
|
|
Accent and Ceiling Tray at Library
|
|
|
|
|
Accent and Ceiling Tray Lighting
|
|
|
|
View Looking into Dining Room and Kitchen
|
|
|
|
Kitchen Wall
|
|
|
|
|
Sun Room
|
|
|
|
Entertainment Center
|
|
|
|
Drive Blocked to Traffic, Allowing Full Concrete Cure
|
|
|
|
|
Protective Grate at Window Well
|
|
|
|
Dog Run for Future Dogsitting
|
|
|
|
Black Cobble as Accent in Front Yard
|
|
|
|
|
Front Yard Ready for Seed
|
|
|
|
Seed Prep to be Worked from SE Corner to Front
|
|
|
|
Final Touches and Cleanup Prior to Seed Prep
|
|
|
|
|
Lowering into Place
|
|
|
|
Honey Locust Headed for Its Spot
|
|
|
|
Large Tree Boomed Over Rear Fence
|
|
|
|
|
|
Drive Apron and Walk Pours Complete - View from Garage Area
|
|
|
|
City Sidewalk and Drive Apron Ready fo Concrete Pour
|
|
|
|
Start Placement of Drive Concrete
|
|
|
|
|
Rebar Chairs Placed Prior to Driveway Pour
|
|
|
|
Pinyon Pines Along East Property Line
|
|
|
|
Landscaping Complete at Oversized Stone Window Well
|
|
|
|
|
SE Plantings Complete - Start of Specialty Fabric
|
|
|
|
Rebar being Tied at Driveway Area
|
|
|
|
Light Shade for Sun Room - South Elevation
|
|
|
|
|
|
Sprinkler Main Line Through Sleeve at North End of Future Driveway
|
|
|
|
Sprinkler Valve Boxes at Rear Gate Area
|
|
|
|
Rear Fence and Main Line Sprinkler Trench
|
|
|
|
|
Removal and Prep for Future Plantings West of Driveway
|
|
|
|
Entry Rails and Downspouts Finished
|
|
|
|
Blower Door Testing is Part of HERS Rating Process
|
|
|
|
|
Headboard Wall in Master Bedroom
|
|
|
|
Shower Door and Hand-Held Shower at Master Bathroom
|
|
|
|
Master Vanity with Sconces Through Mirror
|
|
|
|
|
Prelim Grading at Drive Area
|
|
|
|
Concrete Wash to Temporary Plastic Containment
|
|
|
|
Post Holes at Dog Run and Park Area
|
|
|
|
|
City Sidewalk Poured and Finished
|
|
|
|
Kitchen Backsplash Finished, Ready for Microwave
|
|
|
|
Light Shaft Over Foyer with Whole House Fan
|
|
|
|
|
Master Closet Complete
|
|
|
|
Sanding Hardwood Floors
|
|
|
|
Master Shower Door in Progress, Blue Tape Marks Hardware & Plumbing
|
|
|
|
|
Detail Painting at Misc. Wall Projections
|
|
|
|
Stone and Stucco Finishes at Rear Foundation
|
|
|
|
Prelim Grading Complete at East Wall Line
|
|
|
|
|
Rear Yard Grade in Progress
|
|
|
|
Entry Rails being Field Fabricated
|
|
|
|
Rear Sidewalk Ready for Pour - Plastic is for Wall Protection
|
|
|
|
|
City Walk Formed, Ready for Compaction and Inspection
|
|
|
|
Front Walk Forms and Downspout Drain
|
|
|
|
Roof Stocked, Roof Vents Painted
|
|
|
|
|
|
Ceiling Fan and Stained Trim in Library
|
|
|
|
Closet Shelves in Guest Bedroom
|
|
|
|
Paint Complete, Floor Stain Samples Ready
|
|
|
|
|
View of Northeast Corner of Home
|
|
|
|
Shingles Complete, Metal Roof Underway
|
|
|
|
Gutter Complete at Front Entry
|
|
|
|
|
Shingles Started at Northeast Corner
|
|
|
|
Seamless Gutters Ran on Site
|
|
|
|
Exterior Paint in Progress
|
|
|
|
|
Selection Appointment with Nancy, Blind Corners & Curves
|
|
|
|
Jon and Anne with Debra, Saddleback Design
|
|
|
|
Front Elevation Complete and Ready for Paint and Rails
|
|
|
|
|
South Elevation Finishes Complete and Rady for Paint
|
|
|
|
Stained Trim at Kitchen Coved Ceiling at Skylight
|
|
|
|
Sun Room Windows and Paint Complete
|
|
|
|
|
Basement Paint Complete
|
|
|
|
Basement Paint Complete
|
|
|
|
Starting to Remove Protection from Study Bookshelves
|
|
|
|
|
Caulking Completed at Garage Window
|
|
|
|
Backerod Installed for Future Caulking
|
|
|
|
Staining in Progress
|
|
|
|
|
Final Drywall Coat at Tray Ceiling
|
|
|
|
Masked and Prepped for Paint and Stain
|
|
|
|
Masked and Prepped for Paint and Stain
|
|
|
|
|
Masked and Prepped for Stain and Paint
|
|
|
|
Stain Match Ok'd
|
|
|
|
Stain Match in Progress
|
|
|
|
|
|
Stone in Progress at South Walls
|
|
|
|
Rear Exit Door Installed
|
|
|
|
Stone & Stucco at Northeast Corner
|
|
|
|
|
Starting Paint Prep - Nail Holes Pre-Filled
|
|
|
|
Cabinets Masked for Paint
|
|
|
|
Hardwood Floor Protected
|
|
|
|
|
Kitchen Island Countertop Template
|
|
|
|
Fiberglass Door and Sidelites Installed
|
|
|
|
Kitchen Cabinets Installed
|
|
|
|
|
Kitchen Seat
|
|
|
|
Master Bathroom Cabinets
|
|
|
|
Tile & Trim in Sun Room
|
|
|
|
|
Detail of Kitchen Light Shaft
|
|
|
|
Entertainment Center in Family Room
|
|
|
|
Stair Railing Installed
|
|
|
|
|
Closets in Laundry Room
|
|
|
|
Built-in Shelves in Laundry Room
|
|
|
|
Built-in Shelves in Library
|
|
|
|
|
Master Bathroom Cabinets Protected
|
|
|
|
Kitchen Cabinets being Installed
|
|
|
|
Hardwood Floor Installed and Doors in Progress
|
|
|
|
|
Stone at Southeast Corner Complete
|
|
|
|
Stone on Front Porch Columns - Blue Coating is a Bonding Agent
|
|
|
|
Stone Mason at Work
|
|
|
|
|
Caulk Line Indicates Elevation of Future Sidewalk
|
|
|
|
Alberto Placing Stone on East Elevation
|
|
|
|
Installing Stone at Sun Room Wall
|
|
|
|
|
Front Elevation Stucco Completed
|
|
|
|
Stucco Trim Complete - Prep & Mask for Wall Application
|
|
|
|
Stucco Application at Friezeboard
|
|
|
|
|
Master Tile & Trim Complete
|
|
|
|
Eric on Walk-Thru for Cabinets
|
|
|
|
Library Bookshelves Under Construction
|
|
|
|
|
Basement Trim at Bath & Storage Area Complete
|
|
|
|
Starting Cabinets in Master Bath
|
|
|
|
Tall Storage Cabinet for Master Bath Uncrated
|
|
|
|
|
Material for Finish Carpentry on Trim Rack
|
|
|
|
Basement Bath Cabinets
|
|
|
|
Cabinets Delivered in Boxes for Protection
|
|
|
|
|
Oak Register Cover with Damper, Typical at All Hardwood Areas
|
|
|
|
Hardwood being Installed
|
|
|
|
Typical Supply at Gypcrete - Sealed with Mastik
|
|
|
|
|
Master Shower with Corian Seat and Cap
|
|
|
|
Basement Bath Tile Complete
|
|
|
|
Vladimir Installing Tiles
|
|
|
|
|
Prep & Seal Durock Joints at Master Shower
|
|
|
|
Ditra, Specialty Underlay, Installed in Laundry
|
|
|
|
Hardwood Stocked in Interior of Home
|
|
|
|
|
|
Drywall Finished & Plywood for Hardwood Installed
|
|
|
|
Plywood Under Hardwood Areas Installed with Gaps for Expansion
|
|
|
|
Plywood Glued and Nailed in Hardwood Areas
|
|
|
|
|
Plywood Glued and Nailed
|
|
|
|
Plywood for Hardwood Areas in Progress
|
|
|
|
Subfloor Adhesive for Plywood Installed Over Gypcrete
|
|
|
|
|
Attic Insulation
|
|
|
|
Blown Cellulose in Attic
|
|
|
|
Master Trayed Ceiling Detail for Future Lighting
|
|
|
|
|
Ceiling in Study
|
|
|
|
Entry Light Shaft
|
|
|
|
Soffits in Basement
|
|
|
|
|
West End of Basement Primed
|
|
|
|
Basement Rec Room Primed
|
|
|
|
Drywall and Paint Complete in Garage
|
|
|
|
|
Hand Troweled Texture Complete at Sun Room
|
|
|
|
Hand Troweled Ceiling - Basement Bedroom
|
|
|
|
Prime Coat Complete at Foyer
|
|
|
|
|
Tray Ceiling Needs Final Coat Before Texture
|
|
|
|
Master Tray Coved Ceiling at Master in Progress
|
|
|
|
Taping in Progress
|
|
|
|
|
Cementboard Used at Tub and Shower
|
|
|
|
Master Shower Pan Poured and Sloped to Drain
|
|
|
|
Brown Coat at Stucco & Lathe for Future Stone
|
|
|
|
|
Stucco Operation - East Wall
|
|
|
|
Stucco in Progress - Sun Room Windows
|
|
|
|
Brown Coat Complete at South Wall
|
|
|
|
|
Driveway Cleared of Snow
|
|
|
|
The Day After the Snowstorm
|
|
|
|
Big Snow Storm
|
|
|
|
|
Drywall being Installed
|
|
|
|
Drywall Delivered
|
|
|
|
Attic Buffers Keep Insulation from Falling into Soffits
|
|
|
|
|
Boiler and Heating Valves Panel are Protected from Dust
|
|
|
|
Tubs are Insulated with Spray Foam
|
|
|
|
Insulation in Entry Light Shaft
|
|
|
|
|
Garage Walls are Insulated with Cellulose Over Spray Foam
|
|
|
|
Floors are Insulated with Cellulose for Radiant Heat
|
|
|
|
Basement Walls are Insulated with Cellulose Over Spray Foam
|
|
|
|
|
|
Todd & Maureen
|
|
|
|
Suzanne, Brad & Grace
|
|
|
|
Al & Laretha of Big Al's Insulating
|
|
|
|
|
Steve, EcoProducts & Alex of Ripple
|
|
|
|
Linda Orchid Song, Gary Godden, Paul Brady, Jim O'Connor of Godden Sudick Architects
|
|
|
|
George & Damian of Foam Connection
|
|
|
|
|
Paul of KDC, Al of Big Al's Insulating, and John Y. of KDC
|
|
|
|
Delicious Breads for Our Open House
|
|
|
|
The Main Floor Walls are Fully Insulated with Foam
|
|
|
|
|
Insulation Technicians Working on Basement Ceilings
|
|
|
|
Garage Walls are Partially Insulated with Foam, the Rest will be Cellulose
|
|
|
|
Floor Rimboards are Insulated with Foam
|
|
|
|
|
First Cost of Stucco Finished Over 1 Inch Foam
|
|
|
|
Detail of Stucco Band Around Windows
|
|
|
|
Scratch Coat with Raked Finish - Must Cure for 6 Day Minimum
|
|
|
|
|
Prep for Future Stone & Stucco at South Walls
|
|
|
|
Band & Window Trim and Metals in Progress
|
|
|
|
Foam & Lathe Ready for Inspection
|
|
|
|
|
Typical of Areas Cut Back and Exposed for KDC & Quality Conrol Inspections
|
|
|
|
East Elevation Ready for Trim Details to be Installed
|
|
|
|
Stone Lathe being Stapled Over Drain Plane
|
|
|
|
|
Quickflash and Grace Ice & Water Used to Protect Against Water Intrusion
|
|
|
|
Portable Spray Rig for Touch Up & Small Areas
|
|
|
|
Master Bedroom Walls Done - Ready for Touch Up & Final Spray
|
|
|
|
|
Foam Filled Header and Stud Cavities Above
|
|
|
|
Partial Spray Form at Master Bath Wall
|
|
|
|
Partial Fill of 2x6 Wall, 2nd Pass will Fill Cavity
|
|
|
|
|
Spray Foam Operation and Scraping Off Lumber
|
|
|
|
Spray Foam - Closed Cell Polyurethane In Progress
|
|
|
|
Double Walls to be Insulated at Garden Level
|
|
|
|
|
|
Mailbox Monument is Framed with Treated Material
|
|
|
|
Metal Flashing Over Ice & Water Shield Installed Prior to Sidewalk Pour
|
|
|
|
Arch to Bedroom
|
|
|
|
|
Arch by Entry
|
|
|
|
Whole House Fan Installed in Light Shaft
|
|
|
|
Shower Pan Installed
|
|
|
|
|
Master Tub Installed and Protected
|
|
|
|
Windows are Sealed with Expandable Foam From Inside
|
|
|
|
Radon Intake Pipe in Basement
|
|
|
|
|
Boiler and Radiant Heat Valves
|
|
|
|
Concrete Floors are Already Dry
|
|
|
|
Temp Diesel Heater in Basement
|
|
|
|
|
|
Concrete Floor Still Wet
|
|
|
|
Concrete Floors Freshly Poured
|
|
|
|
Pouring Concrete Floor in Laundry Room
|
|
|
|
|
Concrete Floor being Poured
|
|
|
|
Equipment for Mixing Concrete
|
|
|
|
Carlos Digging Hole for the Mail Box Monument
|
|
|
|
|
Front Porch Soffit with Lattice is Finished
|
|
|
|
Front Porch Fascia with Bands at Top of Posts
|
|
|
|
Ice & Water Shield for Future Sidewalk, Flashing to Follow
|
|
|
|
|
Quickflash Used at Wall Penetrations
|
|
|
|
Transition Between Concrete Wall and Framing Sealed with Vycor
|
|
|
|
Conduit for Future Solar Panels Runs from Attic to Basement
|
|
|
|
|
Pre-Drywall Check of Every Stud with Straight Edge
|
|
|
|
Control Valves for Radiant Heating
|
|
|
|
Boiler for Radiant Heat Installed
|
|
|
|
|
Two Zones of Radiant Heat Tubing in Family Room
|
|
|
|
Radiant Heat Tubing in Master Bedroom
|
|
|
|
Radiant Heat Tubing and Sleepers by Entry
|
|
|
|
|
Sleepers for Radiant Heat are Glued and Nailed
|
|
|
|
All Doors are Installed with Temp Locks for Securitiy
|
|
|
|
All Thresholds are Protected
|
|
|
|
|
Temp Front Door. Sealant is Used Under Thresholds
|
|
|
|
Kitchen Skylight Installed
|
|
|
|
Skylight Installed and Radius Soffits are Finished
|
|
|
|
|
Audio Cables are being Installed
|
|
|
|
Master Soffits with Radius Finished
|
|
|
|
Framing Around Dryer Vent in Garage
|
|
|
|
|
Insulation and Backing for Shelves in Bsmt Storeroom
|
|
|
|
Unfinished Basement is Insulated with Rigid Foil Insulation
|
|
|
|
Detail of Basement Soffit with Radius
|
|
|
|
|
|
Interior Windows Between Family Room and Sun Room
|
|
|
|
Kitchen Light Shaft with Soffit Details Below
|
|
|
|
Lights in Family Room
|
|
|
|
|
Laundry Room Connections
|
|
|
|
Laundry Room Ceiling Fan
|
|
|
|
Light Shaft Above Entry with Opening for Whole House Fan
|
|
|
|
|
Entry Light Shaft is Framed like Regular Outside Walls - Perfect for Insulation
|
|
|
|
Breaker Box in Garage
|
|
|
|
Breaker Box in Basement
|
|
|
|
|
Electric Boxes Installed
|
|
|
|
Gas Lines in Basement
|
|
|
|
Basement Soffits with Alcove for Lights
|
|
|
|
|
Detail of Basement Soffits
|
|
|
|
Ceiling in Basement Bathroom
|
|
|
|
Ductwork Going Through Steel Beam
|
|
|
|
|
Sealed Ductwork
|
|
|
|
Ductworks are Sealed
|
|
|
|
Big Ductworks in Basement
|
|
|
|
|
Garage Door Trim Detail
|
|
|
|
Garage Doors Installed
|
|
|
|
Dormer with Fascias, Corbels and Window Installed
|
|
|
|
|
Windows Installed - Sun Room
|
|
|
|
Rear Porch Finished with Fascias
|
|
|
|
Roof Flashings Installed
|
|
|
|
|
Front Porch Metal Roof has Different Underlayment
|
|
|
|
Roof Ice & Water Shield Installed Over Drip Edge Flashing
|
|
|
|
Roof Paper Goes Up a Minimum of 12 Inches at Head Wall
|
|
|
|
|
Ice & Water Shield Installed in Roof Valleys
|
|
|
|
Ice & Water Shield and Titanium UDL - Excellent Roofing Underlayment
|
|
|
|
Electric Meter Box Installed Over Ice & Water Shield
|
|
|
|
|
Electric Box Flashing Detail. Wall Paper will Go Under Loose Bottom
|
|
|
|
Window Flashing Detail. Second Layer Will Cover Window Flanges
|
|
|
|
We Use Vycor Window Flashing. One More Layer will Go Over Flanges
|
|
|
|
|
Front Porch Box Columns are Framed with Treated Plywood
|
|
|
|
Front Porch Hardi Plank Soffit
|
|
|
|
Fascia Detail at Front of House
|
|
|
|
|
Fascias at Rear of House
|
|
|
|
Carlos Working on Fascias
|
|
|
|
Master Shower Valve
|
|
|
|
|
|
Plumbing in the Basement
|
|
|
|
Plumbing Below the Master Bathroom
|
|
|
|
Plumbing and Dryer Vent in Laundry Room
|
|
|
|
|
Soffits in Basement with Light Shelf
|
|
|
|
Soffits in Basement
|
|
|
|
Chase in the Master Closet
|
|
|
|
|
Chase by the Sunroom
|
|
|
|
The Tiner has Started
|
|
|
|
The Attic Access is Built High to Better Hold the Insulation
|
|
|
|
|
Fascias Detail
|
|
|
|
Fascias at the Front of the House
|
|
|
|
Fascias Above the Garage
|
|
|
|
|
|
Stairs Installed with Finish Sides Protected
|
|
|
|
Firestops on Side of Stairs
|
|
|
|
Future Light Shaft Above Entry
|
|
|
|
|
Dropped Soffit in Kitchen with Firestops Installed
|
|
|
|
Blocks for Grab Bars
|
|
|
|
Blocks for Grab Bars in Master Shower
|
|
|
|
|
Knee Walls and Tub Deck in Master Bath
|
|
|
|
Master Shower Seat
|
|
|
|
Second Dormer is Finished, Scaffold is for Fascias Work
|
|
|
|
|
45 Degree Joint for Soffit Corners
|
|
|
|
We Mark Nails Layout for Perfect Placement
|
|
|
|
We Start Nails with a Modified Nailer & Finish by Hand for a Perfect Finish
|
|
|
|
|
No Gap Between Fascia and Soffit
|
|
|
|
We Install the Soffit Slightly Over the Subfascia for a Better Fascia Fit
|
|
|
|
Hardi Plank Soffit and Miratec Fascias, We Use Galvanized Ring Shank Nails
|
|
|
|
|
Strong Support for Soffits
|
|
|
|
For Soffits We Use 2x4 Blocks 16 Inch O.C.
|
|
|
|
Fascia is Flush with Roof Plane
|
|
|
|
|
2x8 Subfascia is Tight to Roof OSB
|
|
|
|
We Nail Roof OSB to Subfascia for Maximum Strength
|
|
|
|
Fascia and Soffit Material Stored in Garage
|
|
|
|
|
|
Finished Basement Walls
|
|
|
|
Basement Walls
|
|
|
|
Opening for Medicine Cabinet
|
|
|
|
|
Stud Layout Altered for Shower Valve
|
|
|
|
Openings in Basement Window Sill for Insulation
|
|
|
|
Open Corners for Insulation in Basement
|
|
|
|
|
Space for Stairs
|
|
|
|
We Never Nail Blocks in Sides of Joists Flanges Because They would Split
|
|
|
|
Top of Basement Walls - Blocks are Backing Plate for Drywall
|
|
|
|
|
Basement Headers Over Four Feet Long are TimberStrand
|
|
|
|
No Floating Walls Because of Structural Floor
|
|
|
|
TimberStrand Bottom Plates in Basement are Glued and Nailed
|
|
|
|
|
Joist and Stud Layout Starts from One Point for Entire House
|
|
|
|
Master Shower Wall Insulated with Double Layer of Styrofoam
|
|
|
|
We Strap Gable Trusses to Walls for Uplift
|
|
|
|
|
|
Main Gables are Sheathed and the Garage Dormer & Front Porch Roof are Finished
|
|
|
|
Rear Patio Roof Finished
|
|
|
|
Post Base Keeps the Wood Post Away From Concrete
|
|
|
|
|
We Use H Clips for a Stronger Roof
|
|
|
|
We Notch 6x6 Columns to Keep LVL Beam from Twisting - Stronger Connection
|
|
|
|
Truss Clips are Installed on Gable Lookouts for Wind Uplift
|
|
|
|
|
View from Southwest
|
|
|
|
View from Southeast
|
|
|
|
View from Northwest
|
|
|
|
|
Stairs Delivered and Protected
|
|
|
|
Roof OSB will Overlap Fascia - No Gaps
|
|
|
|
Gap for Roof Ridge Vents
|
|
|
|
|
Gable Lookouts Framed 16" O.C. for Maximum Strength
|
|
|
|
We Brace Truss Bottom Cords 8' O.C. to Tighten All Walls Together
|
|
|
|
We Brace Gable Trusses 8' O.C. for Maximum Wind Resistance
|
|
|
|
|
We Block the Roof in Places Where the Pitch Changes
|
|
|
|
Truss Webs Require Lateral Bracing
|
|
|
|
Truss Hold Downs Installed
|
|
|
|
|
Big Truss Hangers
|
|
|
|
Top of Walls
|
|
|
|
Future Skylight Shaft
|
|
|
|
|
Firestops on Top of Double Walls are Installed
|
|
|
|
Ceiling Drywall Backings Installed on Top of Walls
|
|
|
|
2x12 Roll Blocks will Keep Attic Insulation from Falling into Soffits
|
|
|
|
|
|
Top of Walls
|
|
|
|
Front Concrete Porch
|
|
|
|
Rear Concrete Patio
|
|
|
|
|
We Sheet Some Gable Roof Trusses on Ground
|
|
|
|
Carlos is Nailing Hangers to Girder Truss
|
|
|
|
Big Roof Trusses Delivered by Chase Lumber
|
|
|
|
|
2x6 Garage Walls are Built with Same Care as Other Walls
|
|
|
|
Door Flashings are Protected with a Temp 2x6
|
|
|
|
We Use LSL Headers even for Large Nonstructural Openings
|
|
|
|
|
Interior Openings Reinforced with Plywood
|
|
|
|
Wall Connections
|
|
|
|
If We Cannot Overlap Top Plates We Use Steel Straps
|
|
|
|
|
9 or 10' OSB Panels Used to Eliminate Blocks in Walls for More Insulation
|
|
|
|
Corners for Interior Walls are Open for Insulation
|
|
|
|
Basement Window Wells are Covered for Safety
|
|
|
|
|
|
View from Northwest
|
|
|
|
View from Southwest
|
|
|
|
Carlos Removing Snow
|
|
|
|
|
We Leave Windows Covered to Keep the Snow Off
|
|
|
|
We Use an Electric Heater to Keep the Compressor Working in Freezing Weather
|
|
|
|
Little Roof Trusses are Delivered
|
|
|
|
|
Finished Sun Room Walls
|
|
|
|
Garage Walls are Finished
|
|
|
|
All Walls are Finished
|
|
|
|
|
Stair Opening is Covered for Safety
|
|
|
|
Solid 45 Degree Corners - No Drywall Cracks
|
|
|
|
Interior Walls Under Construction
|
|
|
|
|
Dropped Stair Landing
|
|
|
|
Steel Connections are Welded and Web Stiffeners are Installed
|
|
|
|
Steel Columns in Basement are Installed
|
|
|
|
|
|
Garage Floor Protected with Blankets
|
|
|
|
Concrete Workers Preparing Front Porch Area
|
|
|
|
Double Flashing for Front Porch
|
|
|
|
|
Concrete Workers Grading Garage Floor
|
|
|
|
OSB Panels Installed with Gaps for Contractions
|
|
|
|
We Snap Lines for Each Stud so Nails Don't Miss
|
|
|
|
|
Shower Walls - Longer Studs Used Instead of More Bottom Plates for Better Insulation
|
|
|
|
An 8 Foot Level is Used for Maximum Accuracy
|
|
|
|
Walls are Braced Before We Install OSB Panels
|
|
|
|
|
We Build Walls by String Lines, No Guessing or Eye-Balling
|
|
|
|
For Large Windows We Use Double Sill Plate to Eliminate Wall Vibrations
|
|
|
|
Double Bottom Plate for Radiant Heat
|
|
|
|
|
Headers are Flush on Outside for Insulation
|
|
|
|
LSL Headers - No Drywall Cracks
|
|
|
|
Corners Open for Insulation, First Stud is Kept Away
|
|
|
|
|
Hidden Corners are Insulated with Styrofoam and Sealed with Caulking
|
|
|
|
We Nail Posts Together Flat on the Floor for Maximum Tightness
|
|
|
|
Carlos Checks Each Stud with Straight Edge - We Use Only Straight Material
|
|
|
|
|
|
We Always Nail Plywood with Ring Shang Nails
|
|
|
|
For Floor Plywood We Use the Best Glue which Stays Flexible
|
|
|
|
We Brace the Floor Joists before Installing Floor Plywood to Keep Them Perfectly Straight
|
|
|
|
|
We Really Care About Load Points - This One is for Girder Truss
|
|
|
|
We put Rubber Sealant Under Joists to Eliminate Any Squeaks
|
|
|
|
We Keep First Joist Away from Rim for Insulation
|
|
|
|
|
Wall Corners are Open for Insulation
|
|
|
|
Timber Strand Post and Timber Strand Plates Under Big Steel Beam
|
|
|
|
Stair Opening
|
|
|
|
|
Roll Blocks are Installed on Top of Steel Beams and Ledgers
|
|
|
|
Rim Board Reinforced with Extra Blocks
|
|
|
|
Load Point for Roof Girder Truss
|
|
|
|
|
Joists are Installed in Hangers with Little Gaps to Eliminate Any Squeak
|
|
|
|
Hidden Space Between Sill Plate and Roll Blocks is Filled with High Density Foam & Sealed with Spray Foamr
|
|
|
|
Floor Joists Installed on Steel Ledger with Timber Strand Plate and Roll Blocks
|
|
|
|
|
Dropped Floor for Shower
|
|
|
|
Blocks for Basement Walls are Nailed from Top - Which is Much Easier Done than Later from Bottom
|
|
|
|
Basement Window Headers are Installed Flush with Floor Joists for Maximum Window Size
|
|
|
|
|
Altered Joist Layout for Toilet Drain
|
|
|
|
BCI Floor Joists Installed
|
|
|
|
Steel Beams will be Welded Together & Web Stiffener Added
|
|
|
|
|
We Bolted Steel Beams in Concrete Pockets for Maximum Safety During Installation
|
|
|
|
Bolted Steel Beam Connection will be Later Welded
|
|
|
|
Steel Shims Under Beam will be Welded and Pocket will be Filled with Grout
|
|
|
|
|
|
Steel Ledger for Floor Joists
|
|
|
|
Timber Strand Sill Plate Installed on Spray Foamr
|
|
|
|
We Install Sill Plates on Spray Foam
|
|
|
|
|
Plywood, Not OSB, For Floor Delivered
|
|
|
|
BCI Floor Joists Delivered
|
|
|
|
Plates and Temp Posts are Ready for Floor
|
|
|
|
|
View Looking Out Future Basement Windows
|
|
|
|
Steel Beams Delivered
|
|
|
|
Another View of the Landscape Boulders
|
|
|
|
|
|
Use of Backhoe to Push Boulder into Place
|
|
|
|
Approx. 30 Inch Boulder to be Placed Along Retaining Wall
|
|
|
|
Ken Ball Spotting Placement of Boulder
|
|
|
|
|
Start of Boulders for Grade Change & Future Planting
|
|
|
|
Closeup View of Rock Retaining Wall at Sunroom Window Well
|
|
|
|
Completed Basement Slab
|
|
|
|
|
Retaining Wall at Window Well Completed
|
|
|
|
Concrete Finishing - 2x4 Used as a Guide for Control Joint
|
|
|
|
Concrete Finishing of T-Span Slab
|
|
|
|
|
Future Supply & Return Manifolds for Radiant Heat
|
|
|
|
Top View of Pex Tubing for In-Slab Radiant Heat
|
|
|
|
Hydronic Tubing (Pex) Spaced at Approximately 12 Inches on Center
|
|
|
|
|
|
Top View of Main Secction Tied with Rebar to Foundation Caissons
|
|
|
|
Additional Rebar Down Main Section of Structural Slab
|
|
|
|
Steel in T-Span, Foam Rib Tied to Foundation
|
|
|
|
|
Steel Detail with Added Rebars at Column Locations
|
|
|
|
Post & Wall Locations Marked in Yellow and Blue
|
|
|
|
Completed Installation of Structural Slab - Ready for Hydronic Tubing
|
|
|
|
|
T-Span Slab Construction with Wider Voidform at Piers
|
|
|
|
Space Between Foam for Rebar Placement Tied to Piers
|
|
|
|
T-Span Structural Slab in Progress - 2nd Day
|
|
|
|
|
First Day of T-Span Structural Slab - Protected Mid-Day Due to Dark Skies
|
|
|
|
Start of T-Span Slab at East End of Basement
|
|
|
|
Window Frames with Treated Lumber at South & East Walls
|
|
|
|
|
Backfill at Garage Area - Graded for Final Compaction
|
|
|
|
Backfill & Rough Grading in Future Backyard
|
|
|
|
Backfill in Progress at SW Corner
|
|
|
|
|
|
Foundation Check for Level at Top of Wall
|
|
|
|
Trenches in Progress & Underground Plumbing Installed
|
|
|
|
Underslab Radon Trenches in Progress
|
|
|
|
|
Interior View of Partial SW Garden Level Walls
|
|
|
|
Interior View of Full Height Basement Walls
|
|
|
|
Sump Pit in NE Corner of Basement
|
|
|
|
|
View of Garage Wall & Slab Area
|
|
|
|
Foundation Stripped - View of East Wall Counterfort
|
|
|
|
Two-Way Sewer Clean Outs at NE Corner
|
|
|
|
|
|
Doubled Up Concrete Mixers at Pump Hopper
|
|
|
|
Kenny Checking Forms Ahead of Pump Activity
|
|
|
|
Wall Pour in Progress with Concrete Pump
|
|
|
|
|
Typical Steel Laps Tied Off to Vertical at Mat Steel
|
|
|
|
Steel Detail (top row) at Corner of Garage
|
|
|
|
Interior Bracing Completed
|
|
|
|
|
View of Easterly Walls Ready for Pour
|
|
|
|
View of Foundation from NE Corner of Lot
|
|
|
|
Dossey Sudik Inspector Checking Steel Details
|
|
|
|
|
Mat Steel Detail per Dossey Sudik Plan
|
|
|
|
Panels Staged for Exterior Portion of Forms
|
|
|
|
Reinforcing Bars in Progress at Sunroom Window Area
|
|
|
|
|
Bottom Nailers for Alignment of Forms
|
|
|
|
Caissons at Rear Wall Line
|
|
|
|
Poured Piers with Safety Caps at Rebar. Buckets Used for Clean Pour at Top
|
|
|
|
|
Caisson Drilling in Progress and Working Towards Ramp to Exit
|
|
|
|
Completed Basement Dig. Too Wet for Caisson Rig
|
|
|
|
Layout Check Before Garage Excavation
|
|
|
|
|
|
Laser to Verify Cuts & Level
|
|
|
|
Loading Truck for Dirt Haul Off
|
|
|
|
Trucks Staged for Loading
|
|
|
|
|
Excavation in Progress - Ramp into Garage Area
|
|
|
|
Material Staged for Trucks
|
|
|
|
Chuck's Big Toy
|
|
|
|
|
Excavation in Progress
|
|
|
|
Silt Fence, Waddle, and Stake Out Complete
|
|
|
|
Partial View of Lot Prior to Start
|
|
|