Kurowski Menu - Select Desired Link

Dream Homes

WOODHAVEN

The following are photos of the construction progress on the Woodhaven Site.

Click on photos to enlarge:

Southeast View

Front Elevation

View from Northwest

View from West

View from Garden

Rear Elevation

Covered Rear Porch

Rear Elevation View from the South

Light Shelf for Shading

View of Kitchen and Skylight

Kitchen Skylight Shaft Reflective Slope

View of Kitchen

Great Room View into Sun Room with Operable Glass Isolation Wall

Laundry Room with Energy Star Rated Washer and Dryer

Sun Room with Operable Windows and Transoms

Basement Sun Space

Heat Recovery & Air Filtration System

Radiant Heat System

The Woodhaven - Final Touches being Made

Partial Front from Across the Street

View of East Elevation from Neighbor's Dirve

View of SW Corner from HOA Park

Rear Elevation

Potting Bench and Epoxy Finish at Garage Slab

High Efficiency Washer and Laundry Sink

Adjustable Shelf Unit in Mudroom

Library Shelves - Soon to be Filled

Library Cabinets and Storage

Library Desktop

Accent and Ceiling Tray at Library

Accent and Ceiling Tray Lighting

View Looking into Dining Room and Kitchen

Kitchen Wall

Sun Room

Entertainment Center

Drive Blocked to Traffic, Allowing Full Concrete Cure

Protective Grate at Window Well

Dog Run for Future Dogsitting

Black Cobble as Accent in Front Yard

Front Yard Ready for Seed

Seed Prep to be Worked from SE Corner to Front

Final Touches and Cleanup Prior to Seed Prep

Lowering into Place

Honey Locust Headed for Its Spot

Large Tree Boomed Over Rear Fence

Drive Apron and Walk Pours Complete - View from Garage Area

City Sidewalk and Drive Apron Ready fo Concrete Pour

Start Placement of Drive Concrete

Rebar Chairs Placed Prior to Driveway Pour

Pinyon Pines Along East Property Line

Landscaping Complete at Oversized Stone Window Well

SE Plantings Complete - Start of Specialty Fabric

Rebar being Tied at Driveway Area

Light Shade for Sun Room - South Elevation

Sprinkler Main Line Through Sleeve at North End of Future Driveway

Sprinkler Valve Boxes at Rear Gate Area

Rear Fence and Main Line Sprinkler Trench

Removal and Prep for Future Plantings West of Driveway

Entry Rails and Downspouts Finished

Blower Door Testing is Part of HERS Rating Process

Headboard Wall in Master Bedroom

Shower Door and Hand-Held Shower at Master Bathroom

Master Vanity with Sconces Through Mirror

Prelim Grading at Drive Area

Concrete Wash to Temporary Plastic Containment

Post Holes at Dog Run and Park Area

City Sidewalk Poured and Finished

Kitchen Backsplash Finished, Ready for Microwave

Light Shaft Over Foyer with Whole House Fan

Master Closet Complete

Sanding Hardwood Floors

Master Shower Door in Progress, Blue Tape Marks Hardware & Plumbing

Detail Painting at Misc. Wall Projections

Stone and Stucco Finishes at Rear Foundation

Prelim Grading Complete at East Wall Line

Rear Yard Grade in Progress

Entry Rails being Field Fabricated

Rear Sidewalk Ready for Pour - Plastic is for Wall Protection

City Walk Formed, Ready for Compaction and Inspection

Front Walk Forms and Downspout Drain

Roof Stocked, Roof Vents Painted

Ceiling Fan and Stained Trim in Library

Closet Shelves in Guest Bedroom

Paint Complete, Floor Stain Samples Ready

View of Northeast Corner of Home

Shingles Complete, Metal Roof Underway

Gutter Complete at Front Entry

Shingles Started at Northeast Corner

Seamless Gutters Ran on Site

Exterior Paint in Progress

Selection Appointment with Nancy, Blind Corners & Curves

Jon and Anne with Debra, Saddleback Design

Front Elevation Complete and Ready for Paint and Rails

South Elevation Finishes Complete and Rady for Paint

Stained Trim at Kitchen Coved Ceiling at Skylight

Sun Room Windows and Paint Complete

Basement Paint Complete

Basement Paint Complete

Starting to Remove Protection from Study Bookshelves

Caulking Completed at Garage Window

Backerod Installed for Future Caulking

Staining in Progress

Final Drywall Coat at Tray Ceiling

Masked and Prepped for Paint and Stain

Masked and Prepped for Paint and Stain

Masked and Prepped for Stain and Paint

Stain Match Ok'd

Stain Match in Progress

Stone in Progress at South Walls

Rear Exit Door Installed

Stone & Stucco at Northeast Corner

Starting Paint Prep - Nail Holes Pre-Filled

Cabinets Masked for Paint

Hardwood Floor Protected

Kitchen Island Countertop Template

Fiberglass Door and Sidelites Installed

Kitchen Cabinets Installed

Kitchen Seat

Master Bathroom Cabinets

Tile & Trim in Sun Room

Detail of Kitchen Light Shaft

Entertainment Center in Family Room

Stair Railing Installed

Closets in Laundry Room

Built-in Shelves in Laundry Room

Built-in Shelves in Library

Master Bathroom Cabinets Protected

Kitchen Cabinets being Installed

Hardwood Floor Installed and Doors in Progress

Stone at Southeast Corner Complete

Stone on Front Porch Columns - Blue Coating is a Bonding Agent

Stone Mason at Work

Caulk Line Indicates Elevation of Future Sidewalk

Alberto Placing Stone on East Elevation

Installing Stone at Sun Room Wall

Front Elevation Stucco Completed

Stucco Trim Complete - Prep & Mask for Wall Application

Stucco Application at Friezeboard

Master Tile & Trim Complete

Eric on Walk-Thru for Cabinets

Library Bookshelves Under Construction

Basement Trim at Bath & Storage Area Complete

Starting Cabinets in Master Bath

Tall Storage Cabinet for Master Bath Uncrated

Material for Finish Carpentry on Trim Rack

Basement Bath Cabinets

Cabinets Delivered in Boxes for Protection

Oak Register Cover with Damper, Typical at All Hardwood Areas

Hardwood being Installed

Typical Supply at Gypcrete - Sealed with Mastik

Master Shower with Corian Seat and Cap

Basement Bath Tile Complete

Vladimir Installing Tiles

Prep & Seal Durock Joints at Master Shower

Ditra, Specialty Underlay, Installed in Laundry

Hardwood Stocked in Interior of Home

Drywall Finished & Plywood for Hardwood Installed

Plywood Under Hardwood Areas Installed with Gaps for Expansion

Plywood Glued and Nailed in Hardwood Areas

Plywood Glued and Nailed

Plywood for Hardwood Areas in Progress

Subfloor Adhesive for Plywood Installed Over Gypcrete

Attic Insulation

Blown Cellulose in Attic

Master Trayed Ceiling Detail for Future Lighting

Ceiling in Study

Entry Light Shaft

Soffits in Basement

West End of Basement Primed

Basement Rec Room Primed

Drywall and Paint Complete in Garage

Hand Troweled Texture Complete at Sun Room

Hand Troweled Ceiling - Basement Bedroom

Prime Coat Complete at Foyer

Tray Ceiling Needs Final Coat Before Texture

Master Tray Coved Ceiling at Master in Progress

Taping in Progress

Cementboard Used at Tub and Shower

Master Shower Pan Poured and Sloped to Drain

Brown Coat at Stucco & Lathe for Future Stone

Stucco Operation - East Wall

Stucco in Progress - Sun Room Windows

Brown Coat Complete at South Wall

Driveway Cleared of Snow

The Day After the Snowstorm

Big Snow Storm

Drywall being Installed

Drywall Delivered

Attic Buffers Keep Insulation from Falling into Soffits

Boiler and Heating Valves Panel are Protected from Dust

Tubs are Insulated with Spray Foam

Insulation in Entry Light Shaft

Garage Walls are Insulated with Cellulose Over Spray Foam

Floors are Insulated with Cellulose for Radiant Heat

Basement Walls are Insulated with Cellulose Over Spray Foam

Todd & Maureen

Suzanne, Brad & Grace

Al & Laretha of Big Al's Insulating

Steve, EcoProducts & Alex of Ripple

Linda Orchid Song, Gary Godden, Paul Brady, Jim O'Connor of Godden Sudick Architects

George & Damian of Foam Connection

Paul of KDC, Al of Big Al's Insulating, and John Y. of KDC

Delicious Breads for Our Open House

The Main Floor Walls are Fully Insulated with Foam

Insulation Technicians Working on Basement Ceilings

Garage Walls are Partially Insulated with Foam, the Rest will be Cellulose

Floor Rimboards are Insulated with Foam

First Cost of Stucco Finished Over 1 Inch Foam

Detail of Stucco Band Around Windows

Scratch Coat with Raked Finish - Must Cure for 6 Day Minimum

Prep for Future Stone & Stucco at South Walls

Band & Window Trim and Metals in Progress

Foam & Lathe Ready for Inspection

Typical of Areas Cut Back and Exposed for KDC & Quality Conrol Inspections

East Elevation Ready for Trim Details to be Installed

Stone Lathe being Stapled Over Drain Plane

Quickflash and Grace Ice & Water Used to Protect Against Water Intrusion

Portable Spray Rig for Touch Up & Small Areas

Master Bedroom Walls Done - Ready for Touch Up & Final Spray

Foam Filled Header and Stud Cavities Above

Partial Spray Form at Master Bath Wall

Partial Fill of 2x6 Wall, 2nd Pass will Fill Cavity

Spray Foam Operation and Scraping Off Lumber

Spray Foam - Closed Cell Polyurethane In Progress

Double Walls to be Insulated at Garden Level

Mailbox Monument is Framed with Treated Material

Metal Flashing Over Ice & Water Shield Installed Prior to Sidewalk Pour

Arch to Bedroom

Arch by Entry

Whole House Fan Installed in Light Shaft

Shower Pan Installed

Master Tub Installed and Protected

Windows are Sealed with Expandable Foam From Inside

Radon Intake Pipe in Basement

Boiler and Radiant Heat Valves

Concrete Floors are Already Dry

Temp Diesel Heater in Basement

Concrete Floor Still Wet

Concrete Floors Freshly Poured

Pouring Concrete Floor in Laundry Room

Concrete Floor being Poured

Equipment for Mixing Concrete

Carlos Digging Hole for the Mail Box Monument

Front Porch Soffit with Lattice is Finished

Front Porch Fascia with Bands at Top of Posts

Ice & Water Shield for Future Sidewalk, Flashing to Follow

Quickflash Used at Wall Penetrations

Transition Between Concrete Wall and Framing Sealed with Vycor

Conduit for Future Solar Panels Runs from Attic to Basement

Pre-Drywall Check of Every Stud with Straight Edge

Control Valves for Radiant Heating

Boiler for Radiant Heat Installed

Two Zones of Radiant Heat Tubing in Family Room

Radiant Heat Tubing in Master Bedroom

Radiant Heat Tubing and Sleepers by Entry

Sleepers for Radiant Heat are Glued and Nailed

All Doors are Installed with Temp Locks for Securitiy

All Thresholds are Protected

Temp Front Door. Sealant is Used Under Thresholds

Kitchen Skylight Installed

Skylight Installed and Radius Soffits are Finished

Audio Cables are being Installed

Master Soffits with Radius Finished

Framing Around Dryer Vent in Garage

Insulation and Backing for Shelves in Bsmt Storeroom

Unfinished Basement is Insulated with Rigid Foil Insulation

Detail of Basement Soffit with Radius

Interior Windows Between Family Room and Sun Room

Kitchen Light Shaft with Soffit Details Below

Lights in Family Room

Laundry Room Connections

Laundry Room Ceiling Fan

Light Shaft Above Entry with Opening for Whole House Fan

Entry Light Shaft is Framed like Regular Outside Walls - Perfect for Insulation

Breaker Box in Garage

Breaker Box in Basement

Electric Boxes Installed

Gas Lines in Basement

Basement Soffits with Alcove for Lights

Detail of Basement Soffits

Ceiling in Basement Bathroom

Ductwork Going Through Steel Beam

Sealed Ductwork

Ductworks are Sealed

Big Ductworks in Basement

Garage Door Trim Detail

Garage Doors Installed

Dormer with Fascias, Corbels and Window Installed

Windows Installed - Sun Room

Rear Porch Finished with Fascias

Roof Flashings Installed

Front Porch Metal Roof has Different Underlayment

Roof Ice & Water Shield Installed Over Drip Edge Flashing

Roof Paper Goes Up a Minimum of 12 Inches at Head Wall

Ice & Water Shield Installed in Roof Valleys

Ice & Water Shield and Titanium UDL - Excellent Roofing Underlayment

Electric Meter Box Installed Over Ice & Water Shield

Electric Box Flashing Detail. Wall Paper will Go Under Loose Bottom

Window Flashing Detail. Second Layer Will Cover Window Flanges

We Use Vycor Window Flashing. One More Layer will Go Over Flanges

Front Porch Box Columns are Framed with Treated Plywood

Front Porch Hardi Plank Soffit

Fascia Detail at Front of House

Fascias at Rear of House

Carlos Working on Fascias

Master Shower Valve

Plumbing in the Basement

Plumbing Below the Master Bathroom

Plumbing and Dryer Vent in Laundry Room

Soffits in Basement with Light Shelf

Soffits in Basement

Chase in the Master Closet

Chase by the Sunroom

The Tiner has Started

The Attic Access is Built High to Better Hold the Insulation

Fascias Detail

Fascias at the Front of the House

Fascias Above the Garage

Stairs Installed with Finish Sides Protected

Firestops on Side of Stairs

Future Light Shaft Above Entry

Dropped Soffit in Kitchen with Firestops Installed

Blocks for Grab Bars

Blocks for Grab Bars in Master Shower

Knee Walls and Tub Deck in Master Bath

Master Shower Seat

Second Dormer is Finished, Scaffold is for Fascias Work

45 Degree Joint for Soffit Corners

We Mark Nails Layout for Perfect Placement

We Start Nails with a Modified Nailer & Finish by Hand for a Perfect Finish

No Gap Between Fascia and Soffit

We Install the Soffit Slightly Over the Subfascia for a Better Fascia Fit

Hardi Plank Soffit and Miratec Fascias, We Use Galvanized Ring Shank Nails

Strong Support for Soffits

For Soffits We Use 2x4 Blocks 16 Inch O.C.

Fascia is Flush with Roof Plane

2x8 Subfascia is Tight to Roof OSB

We Nail Roof OSB to Subfascia for Maximum Strength

Fascia and Soffit Material Stored in Garage

Finished Basement Walls

Basement Walls

Opening for Medicine Cabinet

Stud Layout Altered for Shower Valve

Openings in Basement Window Sill for Insulation

Open Corners for Insulation in Basement

Space for Stairs

We Never Nail Blocks in Sides of Joists Flanges Because They would Split

Top of Basement Walls - Blocks are Backing Plate for Drywall

Basement Headers Over Four Feet Long are TimberStrand

No Floating Walls Because of Structural Floor

TimberStrand Bottom Plates in Basement are Glued and Nailed

Joist and Stud Layout Starts from One Point for Entire House

Master Shower Wall Insulated with Double Layer of Styrofoam

We Strap Gable Trusses to Walls for Uplift

Main Gables are Sheathed and the Garage Dormer & Front Porch Roof are Finished

Rear Patio Roof Finished

Post Base Keeps the Wood Post Away From Concrete

We Use H Clips for a Stronger Roof

We Notch 6x6 Columns to Keep LVL Beam from Twisting - Stronger Connection

Truss Clips are Installed on Gable Lookouts for Wind Uplift

View from Southwest

View from Southeast

View from Northwest

Stairs Delivered and Protected

Roof OSB will Overlap Fascia - No Gaps

Gap for Roof Ridge Vents

Gable Lookouts Framed 16" O.C. for Maximum Strength

We Brace Truss Bottom Cords 8' O.C. to Tighten All Walls Together

We Brace Gable Trusses 8' O.C. for Maximum Wind Resistance

We Block the Roof in Places Where the Pitch Changes

Truss Webs Require Lateral Bracing

Truss Hold Downs Installed

Big Truss Hangers

Top of Walls

Future Skylight Shaft

Firestops on Top of Double Walls are Installed

Ceiling Drywall Backings Installed on Top of Walls

2x12 Roll Blocks will Keep Attic Insulation from Falling into Soffits

Top of Walls

Front Concrete Porch

Rear Concrete Patio

We Sheet Some Gable Roof Trusses on Ground

Carlos is Nailing Hangers to Girder Truss

Big Roof Trusses Delivered by Chase Lumber

2x6 Garage Walls are Built with Same Care as Other Walls

Door Flashings are Protected with a Temp 2x6

We Use LSL Headers even for Large Nonstructural Openings

Interior Openings Reinforced with Plywood

Wall Connections

If We Cannot Overlap Top Plates We Use Steel Straps

9 or 10' OSB Panels Used to Eliminate Blocks in Walls for More Insulation

Corners for Interior Walls are Open for Insulation

Basement Window Wells are Covered for Safety

View from Northwest

View from Southwest

Carlos Removing Snow

We Leave Windows Covered to Keep the Snow Off

We Use an Electric Heater to Keep the Compressor Working in Freezing Weather

Little Roof Trusses are Delivered

Finished Sun Room Walls

Garage Walls are Finished

All Walls are Finished

Stair Opening is Covered for Safety

Solid 45 Degree Corners - No Drywall Cracks

Interior Walls Under Construction

Dropped Stair Landing

Steel Connections are Welded and Web Stiffeners are Installed

Steel Columns in Basement are Installed

Garage Floor Protected with Blankets

Concrete Workers Preparing Front Porch Area

Double Flashing for Front Porch

Concrete Workers Grading Garage Floor

OSB Panels Installed with Gaps for Contractions

We Snap Lines for Each Stud so Nails Don't Miss

Shower Walls - Longer Studs Used Instead of More Bottom Plates for Better Insulation

An 8 Foot Level is Used for Maximum Accuracy

Walls are Braced Before We Install OSB Panels

We Build Walls by String Lines, No Guessing or Eye-Balling

For Large Windows We Use Double Sill Plate to Eliminate Wall Vibrations

Double Bottom Plate for Radiant Heat

Headers are Flush on Outside for Insulation

LSL Headers - No Drywall Cracks

Corners Open for Insulation, First Stud is Kept Away

Hidden Corners are Insulated with Styrofoam and Sealed with Caulking

We Nail Posts Together Flat on the Floor for Maximum Tightness

Carlos Checks Each Stud with Straight Edge - We Use Only Straight Material

We Always Nail Plywood with Ring Shang Nails

For Floor Plywood We Use the Best Glue which Stays Flexible

We Brace the Floor Joists before Installing Floor Plywood to Keep Them Perfectly Straight

We Really Care About Load Points - This One is for Girder Truss

We put Rubber Sealant Under Joists to Eliminate Any Squeaks

We Keep First Joist Away from Rim for Insulation

Wall Corners are Open for Insulation

Timber Strand Post and Timber Strand Plates Under Big Steel Beam

Stair Opening

Roll Blocks are Installed on Top of Steel Beams and Ledgers

Rim Board Reinforced with Extra Blocks

Load Point for Roof Girder Truss

Joists are Installed in Hangers with Little Gaps to Eliminate Any Squeak

Hidden Space Between Sill Plate and Roll Blocks is Filled with High Density Foam & Sealed with Spray Foamr

Floor Joists Installed on Steel Ledger with Timber Strand Plate and Roll Blocks

Dropped Floor for Shower

Blocks for Basement Walls are Nailed from Top - Which is Much Easier Done than Later from Bottom

Basement Window Headers are Installed Flush with Floor Joists for Maximum Window Size

Altered Joist Layout for Toilet Drain

BCI Floor Joists Installed

Steel Beams will be Welded Together & Web Stiffener Added

We Bolted Steel Beams in Concrete Pockets for Maximum Safety During Installation

Bolted Steel Beam Connection will be Later Welded

Steel Shims Under Beam will be Welded and Pocket will be Filled with Grout

Steel Ledger for Floor Joists

Timber Strand Sill Plate Installed on Spray Foamr

We Install Sill Plates on Spray Foam

Plywood, Not OSB, For Floor Delivered

BCI Floor Joists Delivered

Plates and Temp Posts are Ready for Floor

View Looking Out Future Basement Windows

Steel Beams Delivered

Another View of the Landscape Boulders

Use of Backhoe to Push Boulder into Place

Approx. 30 Inch Boulder to be Placed Along Retaining Wall

Ken Ball Spotting Placement of Boulder

Start of Boulders for Grade Change & Future Planting

Closeup View of Rock Retaining Wall at Sunroom Window Well

Completed Basement Slab

Retaining Wall at Window Well Completed

Concrete Finishing - 2x4 Used as a Guide for Control Joint

Concrete Finishing of T-Span Slab

Future Supply & Return Manifolds for Radiant Heat

Top View of Pex Tubing for In-Slab Radiant Heat

Hydronic Tubing (Pex) Spaced at Approximately 12 Inches on Center

Top View of Main Secction Tied with Rebar to Foundation Caissons

Additional Rebar Down Main Section of Structural Slab

Steel in T-Span, Foam Rib Tied to Foundation

Steel Detail with Added Rebars at Column Locations

Post & Wall Locations Marked in Yellow and Blue

Completed Installation of Structural Slab - Ready for Hydronic Tubing

T-Span Slab Construction with Wider Voidform at Piers

Space Between Foam for Rebar Placement Tied to Piers

T-Span Structural Slab in Progress - 2nd Day

First Day of T-Span Structural Slab - Protected Mid-Day Due to Dark Skies

Start of T-Span Slab at East End of Basement

Window Frames with Treated Lumber at South & East Walls

Backfill at Garage Area - Graded for Final Compaction

Backfill & Rough Grading in Future Backyard

Backfill in Progress at SW Corner

Foundation Check for Level at Top of Wall

Trenches in Progress & Underground Plumbing Installed

Underslab Radon Trenches in Progress

Interior View of Partial SW Garden Level Walls

Interior View of Full Height Basement Walls

Sump Pit in NE Corner of Basement

View of Garage Wall & Slab Area

Foundation Stripped - View of East Wall Counterfort

Two-Way Sewer Clean Outs at NE Corner

Doubled Up Concrete Mixers at Pump Hopper

Kenny Checking Forms Ahead of Pump Activity

Wall Pour in Progress with Concrete Pump

Typical Steel Laps Tied Off to Vertical at Mat Steel

Steel Detail (top row) at Corner of Garage

Interior Bracing Completed

View of Easterly Walls Ready for Pour

View of Foundation from NE Corner of Lot

Dossey Sudik Inspector Checking Steel Details

Mat Steel Detail per Dossey Sudik Plan

Panels Staged for Exterior Portion of Forms

Reinforcing Bars in Progress at Sunroom Window Area

Bottom Nailers for Alignment of Forms

Caissons at Rear Wall Line

Poured Piers with Safety Caps at Rebar. Buckets Used for Clean Pour at Top

Caisson Drilling in Progress and Working Towards Ramp to Exit

Completed Basement Dig. Too Wet for Caisson Rig

Layout Check Before Garage Excavation

Laser to Verify Cuts & Level

Loading Truck for Dirt Haul Off

Trucks Staged for Loading

Excavation in Progress - Ramp into Garage Area

Material Staged for Trucks

Chuck's Big Toy

Excavation in Progress

Silt Fence, Waddle, and Stake Out Complete

Partial View of Lot Prior to Start

 
Find us on Facebook  Join Us on Twitter  Kurowski Blog

Company Profile | Why Select KurowskiDream Homes | Homes and Sites Available
Environmental Commitment | Team Approach | What Others Are Saying | Summit County
Additions & Remodeling | Contact Us | Home | Privacy Policy

© 2010 KUROWSKI DEVELOPMENT CO.
To Make Your Dream Home a Reality: Contact Us
9200 West Cross Drive, Suite 319, Littleton, Colorado 80123
303.972.8680 fax: 303.972.3753  email: info@kurowski.com

 
  Certified Agining-In-Place SpecialistCertified Green Professional  Built Green ENERGY STAR Click to verify BBB accreditation and to see a BBB report.