Fireplace with Finished Hearth & Shelves
|
|
|
|
Finished Elevator Cab & Control Panel
|
|
|
|
Kitchen Countertop Finished
|
|
|
|
|
Painting in Progress in Ivan's Bath
|
|
|
|
Sasha's Bath Nearing Completion
|
|
|
|
Exterior Door Lever
|
|
|
|
|
Note Plant Shelf Lights in Background
|
|
|
|
Interior Railing Finished
|
|
|
|
Driveway Band Rebar in Place - Ready for Pour
|
|
|
|
|
Driveway Forming in Progress at Color Band
|
|
|
|
Driveway Forming Underway
|
|
|
|
Final Grade Underway - North Elevation
|
|
|
|
|
Preliminary Grade - South Side
|
|
|
|
Retaining Wall Finished
|
|
|
|
Downspout Drain Work in Progress
|
|
|
|
|
Windows Caulked at Stucco with Polyurethane Sealant
|
|
|
|
Backer Rod Installed Around Windows Before Caulking
|
|
|
|
View from Golf Course
|
|
|
|
|
North Elevation Ready for Downspouts
|
|
|
|
Garage Roof & Gutters as Viewed from Loft Window
|
|
|
|
Roof & Gutters Finished
|
|
|
|
|
Ridge Vent Installed & Capped
|
|
|
|
East Garage Wall
|
|
|
|
Stair Tower Siding Painted
|
|
|
|
|
Siding Painted
|
|
|
|
Stone Complete - Rear Elevation
|
|
|
|
Retaining Wall in Progress
|
|
|
|
|
Loft Deck Completed
|
|
|
|
Upper Deck Sleepers Wrapped with Deck Protector
|
|
|
|
Basement Shower Door Installed
|
|
|
|
|
Fusion Rail Brackets Installed
|
|
|
|
Basement Kitchenette
|
|
|
|
Master Bath Towel Warmer
|
|
|
|
|
Corian and Fixture in Master Shower
|
|
|
|
Sasha's Shower
|
|
|
|
Kitchen Isalnd Area - Countertop Drilled for Faucets and Accessories
|
|
|
|
|
Angled Bar Top Braced for Future Attachment
|
|
|
|
Initial Template for Kitchen Splash at Range Hood
|
|
|
|
Plumbing Enclosure Under Vanity in Ivan's Bath
|
|
|
|
|
Radiant Heat Manifold in Sasha's Closet
|
|
|
|
Additional Waterproofing Applied at Corner Areas of Tile
|
|
|
|
Roof Stocking in Progress
|
|
|
|
|
|
Trex Decking Installed
|
|
|
|
Stone on Garage Walls
|
|
|
|
Stone on Garage Door Columns
|
|
|
|
|
Stone at Front Door
|
|
|
|
Snow Removed from Front of House
|
|
|
|
Light Fixture by Stairs
|
|
|
|
|
Vanity Light Fixture
|
|
|
|
Light Fixture by Stairs
|
|
|
|
Dining Room Light Fixture & Kitchen Lighting
|
|
|
|
|
View of Kitchen from Family Room
|
|
|
|
Master Bedroom Bookcase & Ceiling
|
|
|
|
Sasha's Closet
|
|
|
|
|
Sasha's Bedroom is Painted
|
|
|
|
Loft Area Light Fixtures
|
|
|
|
Paint Finished in Loft Area
|
|
|
|
|
|
Front of House with Finished Stucco & Fascia Painted
|
|
|
|
Rear of House with Fascia Painted & Stucco in Progress
|
|
|
|
Trex Decking Delivered
|
|
|
|
|
Detail of Deck Vycor Protection & Perimeter Flashing
|
|
|
|
Deck Joists Wrapped and Braced for Decking
|
|
|
|
Foam & Mesh Used for Windows Details at Stucco
|
|
|
|
|
Finish Color of Main Floor Fireplace Wall
|
|
|
|
Finish Color of Kitchen Walls
|
|
|
|
Finish Color of Basement Fireplace Wall
|
|
|
|
|
Interior Doors Painted
|
|
|
|
Door & Window Protected for Stain and Lacquer Application
|
|
|
|
Initial Assembly of Basement Media Center
|
|
|
|
|
Basement Kitchenette Cabinets Being Installed
|
|
|
|
Loft Bookshelves Masked & Ready for Paint
|
|
|
|
Final Prep at Loft Bookshelves
|
|
|
|
|
|
Trusses Masked, Fascias Painted
|
|
|
|
Painted Fascias at Back of House
|
|
|
|
Window Detail to be Completed with High-Impact Mesh
|
|
|
|
|
Foam Detail at Window
|
|
|
|
Laundry Cabinet with Temp Support
|
|
|
|
Extra Insulation at Master Tub
|
|
|
|
|
Sasha's Tub Checked Prior to Tile Completion
|
|
|
|
Pocket Doors in Sasha's Bedroom
|
|
|
|
Suspended Fireplace Hearth
|
|
|
|
|
Windows Over Fireplace Area in Great Room
|
|
|
|
Kitchen Cabinets Installed & Protected
|
|
|
|
Finished Shelves are Stored in Basement
|
|
|
|
|
Bookcases in Loft Area
|
|
|
|
Basement Bookcases
|
|
|
|
Stained Railing and Stairs Complete
|
|
|
|
|
Open Rail System Along Basement Stairs
|
|
|
|
Stain in Process at Stair Stringers
|
|
|
|
Peninsula Mock-Up at Sasha's Work Area
|
|
|
|
|
Template for Kitchen Countertop
|
|
|
|
Cabinet Pulls Installed
|
|
|
|
Final Day of Cabinet Installation
|
|
|
|
|
|
Scratch Coat - Windows Protected
|
|
|
|
Scratch Coat - South Side
|
|
|
|
Scratch Coat at Front of House
|
|
|
|
|
Scratch Coat - Northwest Side
|
|
|
|
Window Seat in Ivan's Bedroom
|
|
|
|
Shelves in Sasha's Closet
|
|
|
|
|
Master Bedroom Bookshelves
|
|
|
|
Kitchen Pantry Shelves
|
|
|
|
Closets in Basement
|
|
|
|
|
Built-in Book Storage in Basement
|
|
|
|
Bookshelves in Loft Area in Progress
|
|
|
|
Tile Installation at Sasha's Shower and Window
|
|
|
|
|
Basement Shower Ready to be Grouted
|
|
|
|
Ivan's Shower
|
|
|
|
Tile at Master Tub Deck
|
|
|
|
|
Master Shower with Linear Drain
|
|
|
|
Floor Tile in Loft Bathroom
|
|
|
|
Floor Tile in Ivan's Bathroom
|
|
|
|
|
Hardwood in Progress at Kitchen and Nook
|
|
|
|
Hardwood Installation in Progress in Great Room
|
|
|
|
Detail of Stair Landing Bullnose
|
|
|
|
|
Railing is Protected
|
|
|
|
Detail of Railing Connections
|
|
|
|
Railing at Stairs
|
|
|
|
|
Loft Railing
|
|
|
|
Loft Flooring
|
|
|
|
Primer Complete at Loft Gypcrete
|
|
|
|
|
Pre-finished Floor Covered for Protection
|
|
|
|
Cork Installed in Rec Room
|
|
|
|
Base for Radius Bookshelves
|
|
|
|
|
Tile in Progress at Sasha's Bath
|
|
|
|
Tile in Progress at Sasha's Bath
|
|
|
|
Foam & Lathe Complete - Ready for Inspection
|
|
|
|
|
Foam & Quickflash Installed at Electrical Box
|
|
|
|
J-Metal at Stucco-Window Termination
|
|
|
|
J-Metal Casing at Door
|
|
|
|
|
|
Upper Deck Walls Wrapped with Siding
|
|
|
|
Siding on Stair Walls Finished
|
|
|
|
Finished North Side of Stair Tower
|
|
|
|
|
Rear Elevation from Southwest Corner of Lot
|
|
|
|
West Gable Firred Out for Stone Termination
|
|
|
|
Main Deck Fascia and Trim Ready for Stucco
|
|
|
|
|
Low Shelves in Sasha's Main Closet
|
|
|
|
Linen Storage in Sasha's Bath
|
|
|
|
Low Shelves in Sasha's Bedroom
|
|
|
|
|
Closet Shelves and Radiant Access Panel Complete
|
|
|
|
Rec Room Maple Bookcase in Progress
|
|
|
|
Rec Room Storage Shelves
|
|
|
|
|
Basement Closet Shelves
|
|
|
|
Partial Trim Delivery and Use of Trim Rack
|
|
|
|
Drywaller Sanding Loft Walls
|
|
|
|
|
|
Maple Stairs Installed with Protection
|
|
|
|
Lower Stairs Installed and Ready for Drywall Finish
|
|
|
|
Door from Deck to Family Room Installed
|
|
|
|
|
Siding Complete at South Dormer
|
|
|
|
North Garage Bay Complete
|
|
|
|
Ivan's Bedroom Window - Siding Sloped to Match Grade
|
|
|
|
|
East Garage Bay Window
|
|
|
|
Siding Complete Between Loft and Bath Windows
|
|
|
|
Drain Plane and Metal Siding Trim Installed Ahead of Siding
|
|
|
|
|
Shower Pan Liner Ready for City Inspection
|
|
|
|
Shower Pan with Liner in Sauna Bath
|
|
|
|
Pre-slope with Mortar Mix Complete at Sashas's Shower
|
|
|
|
|
Basement Fireplace Skimmed - Ready for Prime
|
|
|
|
High Intensity Light Used During Final Sanding
|
|
|
|
Touchup Sanding Prior to Final Skimcoat
|
|
|
|
|
Taping and Window Wrap at Master Bedroom
|
|
|
|
Drywall Taping in Progress
|
|
|
|
Durock Installed for Future Sauna
|
|
|
|
|
|
Taped Drywall
|
|
|
|
Siding Started
|
|
|
|
Detail of Window Trim with Double Metal Flashing
|
|
|
|
|
Detail of Window Trim with Gap for Caulking
|
|
|
|
Fascia on North Garage Dormer Finished
|
|
|
|
Fascia on High Stair Dormer Finished
|
|
|
|
|
|
Rear Deck Soffit with 1x6 T&G Cedar
|
|
|
|
Small Soffit in Front of House
|
|
|
|
Soffit Above Entry Door
|
|
|
|
|
Fascia Detail
|
|
|
|
Rear of House with Finished Fascia
|
|
|
|
Radius Corner Bead at Window
|
|
|
|
|
Loft Area
|
|
|
|
High Windows in Family Room
|
|
|
|
Sasha's Bathroom - Pex to be Routed at Bench and Tub
|
|
|
|
|
Sasha's Bedroom Ceiling
|
|
|
|
Master Bedroom Soffit
|
|
|
|
Master Bathroom Durock - Typical at Tiled Areas
|
|
|
|
|
Soffit and Niche by Ivan's Bedroom
|
|
|
|
Ivan's Bedroom Ceiling
|
|
|
|
Boiler is Protected from Dust
|
|
|
|
|
Completed Foam Enclosure at Sauna Area
|
|
|
|
Checking Temperature of Gypcrete
|
|
|
|
Enclosure for Future Ceiling Speaker
|
|
|
|
|
|
Yummy
|
|
|
|
You Scream, I Scream...
|
|
|
|
Ice Cream Lady
|
|
|
|
|
Engineers' Discussion
|
|
|
|
Jon Photographing the Technology Case
|
|
|
|
Visitors from NREL
|
|
|
|
|
Technology Display Case
|
|
|
|
Welcome to Our Open House
|
|
|
|
View from Golf Course
|
|
|
|
|
Fascias on High Back Gable are Finished
|
|
|
|
Fascias at Front of House
|
|
|
|
Blocks for Grab Bars in Sasha Bedroom
|
|
|
|
|
Blocks for Grab Bars in Sasha Bathroom
|
|
|
|
Walls & Ceiling Above Stairs
|
|
|
|
Ready for Blown Fiberglass at Basement Ceiling
|
|
|
|
|
Fiberglass Sound Insulated Wall Between Family Room and Sasha Bedroom
|
|
|
|
Ceiling in Loft Area is Insulated with Blown Fiberglass
|
|
|
|
Loft Walls Done, Trusses to Receive Blown Fiberglass
|
|
|
|
|
Foam Insulated Ceiling in Ivans Bedroom
|
|
|
|
Closed Cell Foam Insulation Used in Sashas Bedroom
|
|
|
|
Insulated Rafters Above Storage Room
|
|
|
|
|
Foamed at Rim Joists for Complete Air Seal
|
|
|
|
Foam Insulated Rafters in Loft Area
|
|
|
|
Partial Foam Under Loft Deck
|
|
|
|
|
|
Insulated Basement Walls
|
|
|
|
Insulated Attic Knee Walls in Master Bedroom
|
|
|
|
Basement Walls are Sprayed with Foam Insulation
|
|
|
|
|
1" Foam for Air Seal Applied at Garage Walls
|
|
|
|
Insulation Technician at Work
|
|
|
|
Foam Spray Rig in Trailer
|
|
|
|
|
Access Holes for Insulation
|
|
|
|
Baffles for Insulation Control Above Family Room
|
|
|
|
Extra Attic Access in Family Room
|
|
|
|
|
Drywall Complete for 1" of Foam Spray
|
|
|
|
Drywall on Garage Ceiling being Installed
|
|
|
|
Gypcrete Floor in Loft Area
|
|
|
|
|
Gypcrete Floor in Master Bedroom
|
|
|
|
Heaters Warm Up House After Gypcrete is Poured
|
|
|
|
Pex Tubing for Radiant Heat in Mechanical Room
|
|
|
|
|
Pex Tubing for Radiant Heat in Basement
|
|
|
|
Temp Cover of Upper Deck
|
|
|
|
EPDM-60mil-Roof Complete, Ready for Future Finishes and Walkable Deck
|
|
|
|
|
Tapered Underlay Installed for Deck Drain
|
|
|
|
Deck Columns are Built with Treated Plywood
|
|
|
|
Carlos Working on Deck Box Columns
|
|
|
|
|
|
Material for Exterior Trim in Garage
|
|
|
|
Vycor Flashing over Quick Flash
|
|
|
|
Fireplaces are Protected
|
|
|
|
|
Box Columns Covering Fireplace Flue
|
|
|
|
Chase in Elevator Shaft with Holes for Insulation
|
|
|
|
Framing Around Duct Works in Elevator Shaft
|
|
|
|
|
Framing Around Duct Work in Master Closet
|
|
|
|
Master Tub Deck
|
|
|
|
PEX Tubing in Family Room
|
|
|
|
|
PEX Tubing in Master Bedroom
|
|
|
|
Carlos Finished Thermomax Insulation in Basement
|
|
|
|
Basement Doors
|
|
|
|
|
Electric Box Modified to Fit at Pocket Door
|
|
|
|
CSST (Gas Line) being Run to Future Manifold
|
|
|
|
Cold Air Return Fully Ducted and Sealed, Eliminating Air Leakage
|
|
|
|
|
|
North Garage Bay Window with Access Holes for Insulation
|
|
|
|
Kitchen Knee Wall
|
|
|
|
Fireplace Flue Going to Roof
|
|
|
|
|
Pipes Behind Upper Fireplace
|
|
|
|
Gas Fireplaces Installed
|
|
|
|
Firestop Blocks Between Electric Boxes
|
|
|
|
|
Recessed Light Boxes
|
|
|
|
Sasha Bathroom
|
|
|
|
Detail of Shower Valve
|
|
|
|
|
Basement Shower Seat and Wall with Angled Opening
|
|
|
|
Basement Bathroom
|
|
|
|
Drain Pipes under Sasha Shower
|
|
|
|
|
Water Lines under Master Bathroom
|
|
|
|
Drain Pipe behind Sister Wall in Basement
|
|
|
|
Water Lines
|
|
|
|
|
Water Line Distribution Points
|
|
|
|
Yellow Gas Lines
|
|
|
|
Pipes and Wires along Steel Beam
|
|
|
|
|
Low Voltage Wires
|
|
|
|
Electric Wires Outside the Mechanical Room Door
|
|
|
|
Ceiling in Mechanical Room
|
|
|
|
|
Altered Floor Joist Layout for Lights
|
|
|
|
Basement Ceiling
|
|
|
|
Sealed Ductworks for More Efficient Airflow
|
|
|
|
|
Low Profile Ductwork for More Efficient Framing
|
|
|
|
AC Unit in Basement
|
|
|
|
Upper Deck Knee Walls
|
|
|
|
|
Temp Entry Door Installed
|
|
|
|
Miratec Trim Detail
|
|
|
|
Garage Doors Installed
|
|
|
|
|
East Garage Bay Window Installed
|
|
|
|
Electric Meter Box Installed Over Vycor Flashing
|
|
|
|
Blue Quick Flash for Electric Boxes
|
|
|
|
|
|
Insulated Foundation Walls
|
|
|
|
All Ductwork is Sealed
|
|
|
|
Sealed Ductwork in Basement
|
|
|
|
|
Laundry Fan
|
|
|
|
Basement Bathroom Fan
|
|
|
|
Material for Duct Works
|
|
|
|
|
Toilet Drain
|
|
|
|
Plumbers Started
|
|
|
|
West Bedrooms Windows Installed
|
|
|
|
|
Windows by Stairs
|
|
|
|
Garage East Bay Window on Inside
|
|
|
|
Garage East Bay Window
|
|
|
|
|
Garage North Bay Window on Inside
|
|
|
|
Garage North Bay Window
|
|
|
|
Green VY Corners Provide a Nice Tight Corner at Each of the Window Openings
|
|
|
|
|
|
Rear Deck Ceiling
|
|
|
|
Front Porch Ceiling
|
|
|
|
Hold Downs by Entry Door
|
|
|
|
|
Hidden Inverted Hold Down in Basement
|
|
|
|
Gable Trusses are Strapped Down 4' OC
|
|
|
|
Attic Access in Master Closet
|
|
|
|
|
Niche in Master Bedroom
|
|
|
|
Sasha's Bathroom Rake Ceiling
|
|
|
|
Basement Walls
|
|
|
|
|
|
Sister Walls in Basement for Better Insulation
|
|
|
|
Future Basement Sauna
|
|
|
|
Cove Ceiling in Master
|
|
|
|
|
Cove Ceiling in Ivan's Hallway
|
|
|
|
Basement Walls with LSL Bottom Plates
|
|
|
|
Garage Roof
|
|
|
|
|
Roof is Covered with UDL Roofing Underlayment
|
|
|
|
Roofers Working with Ice & Water Shield on Master Bedroom Roof
|
|
|
|
Slots for Ridge Vents are Cut
|
|
|
|
|
|
East Garage Gable Timber Truss
|
|
|
|
View from Loft to Great Room
|
|
|
|
Lower Walls in Great Room
|
|
|
|
|
Ceilings in Loft Area
|
|
|
|
Attic Knee Wall on Loft Area
|
|
|
|
Post and Ceilings in Loft Area
|
|
|
|
|
Shower Wall in Master Bathroom
|
|
|
|
Master Ceiling and Attic Walls
|
|
|
|
Top of Rake Walls in Sasha Bathroom
|
|
|
|
|
Sasha Bathroom Walls
|
|
|
|
Upper Deck Roof and Timber Truss
|
|
|
|
East Garage Gable Timber Truss
|
|
|
|
|
|
View from Southwest
|
|
|
|
View from Southeast
|
|
|
|
View from Golf Course
|
|
|
|
|
View from Northwest
|
|
|
|
View from Roof
|
|
|
|
View of Green Mountain and Taj Mahal
|
|
|
|
|
Stair Tower
|
|
|
|
We Use H Clips on Roof
|
|
|
|
Front Gable Timber Truss and Overhangs
|
|
|
|
|
Upper Rake Overhang Above Deck
|
|
|
|
Upper Deck Roof
|
|
|
|
Upper Deck Roof Timber Truss
|
|
|
|
|
Roof Above Deck
|
|
|
|
Stair Dormer
|
|
|
|
Notice Our Special Bin for Recyclables - Another Green Step Taken on All KDC Jobs
|
|
|
|
|
Northwest Part of Roof
|
|
|
|
Long Roof Plane
|
|
|
|
Roofs Above Master and Stairs
|
|
|
|
|
Timber Beams in Garage Gable
|
|
|
|
Garage Roof
|
|
|
|
Garage Dormer Roof from the Inside
|
|
|
|
|
Garage Dormer Roof
|
|
|
|
Garage Dormer
|
|
|
|
Elevator Door Detail
|
|
|
|
|
Large Posts in Elevator Walls
|
|
|
|
Great Room from Loft
|
|
|
|
Loft Area with LVL Beam for Large Timber Truss on Outside
|
|
|
|
|
Inside the Great Room
|
|
|
|
Rake Walls by Ivan's Bedroom
|
|
|
|
Rake Sheer Walls by Sasha's Bedroom
|
|
|
|
|
Beams and Rafters Everywhere
|
|
|
|
Multiconnections
|
|
|
|
Beam Connections
|
|
|
|
|
|
Garage Roof
|
|
|
|
Front Porch Roofs
|
|
|
|
Entry Roof
|
|
|
|
|
Laundry Room Roof
|
|
|
|
Post, Wood Beams, Steel Beams and Rafters
|
|
|
|
Ivan's and Entry Timber Trusses Installed
|
|
|
|
|
Upper Deck 6x10 Beams Installed
|
|
|
|
Master Bedroom Trusses Installed
|
|
|
|
Carlos Working on Epoxy Connections
|
|
|
|
|
Interior Hold Downs Installed in Epoxy
|
|
|
|
Crane Moving Wood Timbers
|
|
|
|
Paul Setting Trusses
|
|
|
|
|
Setting Garage Truss
|
|
|
|
Paul & Jerry Setting Garage Trusses
|
|
|
|
Paul Disconnecting the Cable
|
|
|
|
|
Crane Lifting Truss
|
|
|
|
Crane Stabilization and Leveling System
|
|
|
|
Purchase Source
|
|
|
|
|
Garage Walls Braced before Truss Installed
|
|
|
|
Upper Roof Trusses Delivered
|
|
|
|
Rear of House with Deck Finished
|
|
|
|
|
Rear Deck is Framed
|
|
|
|
Front Gable Overhangs and Sub Fascias
|
|
|
|
Beams by Ivan's Bedroom
|
|
|
|
|
Beam Pocket by Front Porch
|
|
|
|
Lower Roof Trusses Delivered
|
|
|
|
Rear Patio Flashing
|
|
|
|
|
|
Rear Patio is Finished with Control Joints
|
|
|
|
Pump Operator with Remote Pack Guides the Boom Through the House
|
|
|
|
Initial Screed Work in Progress
|
|
|
|
|
Last of Patio Concrete is being Pumped
|
|
|
|
Rear Patio Pour Nearing Completion
|
|
|
|
Pump Hose Through Joists for Patio Pour
|
|
|
|
|
Boom from Concrete Pump Through Great Room Window
|
|
|
|
Rear Patio Forming and Rebar in Progress
|
|
|
|
Start Prep and Grade - Rear Patio Area
|
|
|
|
|
Rear Deck is Framed
|
|
|
|
Deck Connections Ready for Hardware
|
|
|
|
Deck Ledgers Installed over Ice & Water Shield
|
|
|
|
|
Timber Beams for Future Porch Roofs
|
|
|
|
Timber Posts for Loft Roof
|
|
|
|
Partial Cut Roof at Loft
|
|
|
|
|
Upper Deck to Receive EPDM Roof
|
|
|
|
Timber Beam Let into Upper Bath Wall
|
|
|
|
Welded Beams and Timber Outrigger
|
|
|
|
|
|
Upper Rake Wall
|
|
|
|
Great Room Windows View from 2nd Floor
|
|
|
|
Steel Shear Wall with Underframe
|
|
|
|
|
Ivan's Rake Walls and Bay
|
|
|
|
Lookouts for Facia & Roof are 16" On Center
|
|
|
|
Front Gable Wall & Lookouts
|
|
|
|
|
Accessible Grading Allows for Drainage
|
|
|
|
Accessible Exterior Garage Door
|
|
|
|
Accessible Garage Entry
|
|
|
|
|
|
View from Golf Course
|
|
|
|
Rear of House
|
|
|
|
Roof Above Sasha Bedroom
|
|
|
|
|
Detail of Roof Connectors
|
|
|
|
Walls and Stairs in Basement
|
|
|
|
Future Upper Floor Storage
|
|
|
|
|
Upper Walls and High Roof Ridge
|
|
|
|
Very Tall Wall by Stairs
|
|
|
|
Extreme Hold Downs
|
|
|
|
|
Front Gable Wall
|
|
|
|
Timber Beams Delivered
|
|
|
|
Upper Temp Stairs Installed
|
|
|
|
|
|
Garage Floor Before Concrete Pour
|
|
|
|
Upper Stair Landing Framed
|
|
|
|
Lower Temp Stairs Installed
|
|
|
|
|
Stair Opening from Second Floor to Basement
|
|
|
|
2x12 Rafters above Future Bedrooms
|
|
|
|
Cut 2x12 Rafters Installed
|
|
|
|
|
View of Family Room Walls from Second Floor
|
|
|
|
Second Floor Finished
|
|
|
|
Second Floor and First Plates Finished
|
|
|
|
|
Big Wall on Top of Steel Beam Before Lifted by Crane
|
|
|
|
18-Foot Family Room Wall Before Lifted by Crane
|
|
|
|
Monster LVL Beams Before Lifted by Crane
|
|
|
|
|
Welding Shear Wall Iron
|
|
|
|
Welding Shear Wall Iron
|
|
|
|
Finishing Basement Floor
|
|
|
|
|
|
Concrete Finisher making Expansion Joints
|
|
|
|
Concrete Finishers Troweling Basement Floor
|
|
|
|
Basement Slab being Poured
|
|
|
|
|
Basement Floor being Poured
|
|
|
|
Concrete Pumped Through Main Floor
|
|
|
|
Concrete Mixers Waiting for Basement Floor Pour
|
|
|
|
|
Access in Floor for Concrete Pump
|
|
|
|
Finished and Braced East Rake Walls
|
|
|
|
West Rake Wall
|
|
|
|
|
View from Northwest
|
|
|
|
Another Shear Wall with OSB
|
|
|
|
Small Wall but a Lot of Load Points and Studs
|
|
|
|
|
Interior Shear Walls with OSB - Floor is Protected Against Weather
|
|
|
|
Small Rake Wall in Master Bedroom
|
|
|
|
Most Interior Walls are 2x6 and Sheathed with OSB
|
|
|
|
|
West Overhang
|
|
|
|
Basement Window Openings are Framed
|
|
|
|
Walls Sheathed, We Brace OSB in Middle of Rim Board for Maximum Shear Resistance
|
|
|
|
|
Many Hold Downs for Extreme Sheer Resistance
|
|
|
|
Massive Posts for Grage Door Header
|
|
|
|
Front of House - Stored Material is Protected
|
|
|
|
|
Garage Walls Under Construction
|
|
|
|
Front Wall if Framed - Floor is Weather Protected
|
|
|
|
We Keep First Stud Away from Corner for Insulation
|
|
|
|
|
Hold Downs for Floor Beams
|
|
|
|
Hold Down for Floor in Basement
|
|
|
|
Headers are Flush Outside for Insulation
|
|
|
|
|
We Keep First Stud Away from Corner for Insulation
|
|
|
|
Nonstructural Corners are Open for Insulation
|
|
|
|
Plates for Radiant Heat and Gypcrete Floor Installed
|
|
|
|
|
Water Protection
|
|
|
|
Floor Protected with Plastic to Keep Void in Basement Dry
|
|
|
|
Electric Conduit Under Radiant Heat Tubing
|
|
|
|
|
Basement Floor Before Concrete Pour
|
|
|
|
Radiant Heat Tubing Installed
|
|
|
|
Tubing for Radiant Heat Floor
|
|
|
|
|
Steel Wires and Rebars Installed
|
|
|
|
Steel Wires Installed for Concrete Slab
|
|
|
|
Rebars Installed on Plastic Chairs
|
|
|
|
|
Foundation is Drilled and Rebars Installed with Epoxy
|
|
|
|
Steel Rebars Installed for Structural Floor
|
|
|
|
Steel Rebars Before Installation
|
|
|
|
|
Foam Forms for Structural Floor Sit on Void
|
|
|
|
Void Installed
|
|
|
|
Foam Forms Delivered
|
|
|
|
|
|
Great View from 1st Floor - Golf Course and Lookout Mtn
|
|
|
|
Plywood Installation in Progress
|
|
|
|
Low VOC Adhesives Used
|
|
|
|
|
Joists Braced before Plywood Installed
|
|
|
|
Elevator Shaft Walls are Framed
|
|
|
|
Steel Basement Columns Installed
|
|
|
|
|
Special Layout to Miss Plumbing
|
|
|
|
Rollblocks on Top of Steel Beams
|
|
|
|
Steel Beams Installed on Temp Wood Posts
|
|
|
|
|
Load Point Blocks Under Big Windows
|
|
|
|
Load Point Blocks Under Big Beam
|
|
|
|
Rimboards Reinforced with 2x6 Blocks
|
|
|
|
|
Joists in Hangers are Left Short to Eliminate Squeaks
|
|
|
|
Floor Ready for Plywood
|
|
|
|
Dropped Floor for Shower - Ivan's Bath
|
|
|
|
|
Ledgers are Protected with Water Proof Membrane
|
|
|
|
Steel Beams and Partial Joists Staged
|
|
|
|
Capital Crane Set Up to Boom Beams and Partial Joists
|
|
|
|
|
Headers Kept Flush to Outside for Insulation
|
|
|
|
Walkout Walls Near Completion
|
|
|
|
Treated Timber Strand Plates are Installed Over Foam
|
|
|
|
|
Small Gaps Sealed with Foam
|
|
|
|
Carlos Applying Spray Foam Before Sill Plates
|
|
|
|
Steel for Basement Floor Delivered
|
|
|
|
|
Chuck Grading Inside Foundation
|
|
|
|
Window Well and Gas Meter Installed
|
|
|
|
Radon Outlet
|
|
|
|
|
|
Gravel Type Material Used to Backfill Underground Plumbing
|
|
|
|
Piers for Rear Deck Formed and Poured
|
|
|
|
Safety Signs Installed
|
|
|
|
|
Gravel for Temp Driveway Delivered
|
|
|
|
Electric Lateral and Conduit for Phone and TV
|
|
|
|
Foundation Backfill Nearing Completion
|
|
|
|
|
Foam Insulation Complete, Ready for Backfill
|
|
|
|
Foam Insulation at Walkout Slab Areas
|
|
|
|
Slab Edge Insulation being Installed
|
|
|
|
|
Completed Drain System
|
|
|
|
Exterior Drain Encased in Gravel
|
|
|
|
Sump Pit and Future Mechanical Room
|
|
|
|
|
Trenches for Drain System
|
|
|
|
Hold Downs in Place, Per Engineered Plan
|
|
|
|
Foundation Forms Stripped, Dampproofing Complete
|
|
|
|
|
Two Mixers at Concrete Pump Hopper
|
|
|
|
Foundation Pour in Progress
|
|
|
|
Bracing at Basement Walls
|
|
|
|
|
Anchor Bolts are Installed in Wet Concrete
|
|
|
|
Front Entry and Garage Walls Bracing in Progress
|
|
|
|
Bracing at West Foundation Walls
|
|
|
|
|
|
Surveyors Setting Up for Form and Location Verification
|
|
|
|
Foundation Forms and Bracing Along West Wall Line
|
|
|
|
Foundation Braces Along Tall Garage Wall
|
|
|
|
|
Wall Construction and Basement Pads - View from Northwest
|
|
|
|
Footings and Pads Striped - Wall Construction Underway
|
|
|
|
Pump Set for Concrete Pour of Footings - April 14th
|
|
|
|
|
Added Rebar at Enlarged Footing
|
|
|
|
Reinforcing in Place, Per Engineered Plans
|
|
|
|
Footings at Future Elevator Pit
|
|
|
|
|
Soils Engineer Conducting Footing Inspection
|
|
|
|
Top View - Footings and Pads from Southeast
|
|
|
|
Footings and Basement Pads Formed - Ready for Rebar
|
|
|
|
|
Rebar in Place at Basement-Garage Area
|
|
|
|
Footings Formed with Rebar at Front Porch Area
|
|
|
|
Footing Forms at Walkout Area
|
|
|
|
|
Footing Forms at Garage Wall
|
|
|
|
Soils Test Bores to Check for Suitable Materials
|
|
|
|
Partial Excavation - Wet After Snow Storms
|
|
|
|
|
Partial Excavation - Wet After Snow Storms
|
|
|
|
KDC's Start-Up Team at Pre-Construction Meeting
|
|
|
|
Empty Lot Along Fossil Trace Golf Course - Silt Fence Installed
|
|
|