640 MCARTHUR DRIVE
Douglas County

For more information about Kurowski Development, send your request to: info@kurowski.com.

Construction Photos
Click on photos to enlarge

April 25 - May 9, 2007

Installing Electrical Fixtures

George Finishing Tile

Spraying Lacquer

March 28 - April 23, 2007

Small Details

Floating Stucco Coat

Creating a Flat Surface

Templating Stair Rail

Templating Stair Rail

Installing Stair Caps

Nailing Study Trim

Ripping Study Wainscot

Hanging Doors

March 14, 2007

Courtyard Wall and New Trees

Courtyard Gate Detail

Courtyard Gate

Radius Wall

Radius Wall with Vycor Flashing on Top

Vycor Flashing on Top of Courtyard Wall

Vycor Flashing on Top of Gate Structure

Charles Installing Vycor Flashing

Bottom of Gate Piers

Vycor Flashing and Metal Flashing at Bottom of Piers

Round Top of Radius Wall

Courtyard Wall Under Construction

February 26-March 9, 2007

The Drywall is Finished

Cooktop Range Hood

Painters Spraying

Drywall Texture

Drywall Mud

Drywall Mud

Installing Drywall

Roofers Installing Roof Tiles

Roof Tiles are Delivered

Courtyard Wall Gate Under Construction

Steel Beams for Courtyard Gate

Radius Courtyard Wall Under Construction

Courtyard Wall Under Construction

Galvanized Posts and Beams for Courtyard Wall

XC Foundation Crew Pouring Caissons for Courtyard Wall

Caissons for Courtyard Wall are Poured

Drilling Caissons for Yard Wall

Planting Tree

Putting Tree in Hole

Digging Hole

Transporting Tree

February 5-15, 2007

Building the Boiler

Boiler Work Continues

Radiant Tubing is Down

Covering Radiant Tubes with Gypcrete

Floating Gypcrete Out

Floor is Poured

Mechanical Room

Radiant Heat Pipes

Heating Manifold

Deck Cedar Soffit

Finished Facias

Jumbo Tex Wall Wrap

Flashing Under Porch Post Wrapping

Wrapped Porch Columns

Backing for Courtyard Wall

Roof is Prepared for Tile Roofing

Starting the Stucco Work

Range Hood

Attic Fan Installed

Charles Cleaning

Drywall Delivered

Drywall Mud

Hanging Drywall

Screwing in the Drywall

February 2, 2007

Kitchen Window Detail

Kitchen Wall with Angled Arch

Deck Flashing

Garage Doors with Timber Headers

Garage Walls are Insulated

Insulated Walls and Plastic Barrier

House is Heated with Propane

Kirk Installing Tubes for Radiant Heat

Radiant Heat Tubes

Radiant Heat Tubes in Kitchen

More Radiant Heat Tubes

Stairs are Closed Before Gyp is Poured

January 29, 2007

Infrastructure

We have a Photo Record of Interior Walls

Air Handler Installed Under Stairs

Insulation Truck

Installing Nettings

Nettings Installed for Dry Cellulose

Cellulose Machine

Insulation Tech Filling Netting with Cellulose

Walls are Insulated with Dry Cellulose

January 19, 2007

Stairs Installed and Protected

Arch in Basement

Fascia Detail

Sleepers for Kitchen Island Cabinets

Efficient Boiler Installed

Floor Heating Tubes Before Installation

Floor Sleepers for Cabinets in Laundry Room

Heating Tubing is Ready to Connect to Boiler

Keith Working on Fascia

Mechanical Room Insulated with Cellulose

Outside Window Detail and Timber Headers

Safety Railing Around Stair Openings

December 30, 2006

Our Second Snow Storm...

December 27, 2006

Breaker Boxes Installed

Electric Wires and Canlights

Family Room Fireplace Installed

Garage Doors Installed

Snow Removed After Blizzard

Snow Removed From Driveway

December 15, 2006

2x10 Subfascias

Cedar Fascia and Soffit

Garage Door Jambs Detail

Energy Efficient Windows

Windows Installed

Electricians Started

Air Sealed Canlights Installed

No Copper Pipes

Rehau Pex Plumbing

November 24, 2006

Finished Roof Underlayment

Roof Underlayment Finished

Exterior Kitchen Walls

Keith Starting Work on Exterior Trim

Front Door and Angled Arches

Detail of Entrance Arches

Temporary Front Door Installed

Kitchen Ceiling

Family Room Fireplace

November 8-14, 2006

Chuck Anderson Working on Septic Tanks

Septic System

Septic Tanks Installed

Roofers Started

The Best Roofing Underlayment

Roofers Installing Titanium-UDL

Grace Ice & Water Shield for Roof Valleys and Perimeter

Matt Cutting Roof Sheathing

Vycor Strip on Roof Perimeter

Roofers Working Avobe Master Bathroom

Finishing Roof Sheathing

Roof Sheathing Almost Complete

Roof Sheathed - View from Southwest

Plates for Basement Walls

First Basement Walls are Framed

Dining Room Ceiling

Kitchen Roof & Ceiling

Master Bedroom Ceiling

Master Bedroom Ceiling - Hip

Garage Door Opening Detail

Front of the House

October 18-30, 2006

Sunrise

View from House

Paul Clearing Snow

Arch in Dining Room

Connection of Interior and Outside Walls Open for Insulation

Open Corner for Insulation

Opening for Insulation in Family Room

Walls are Braced before Truss Installation

Braced Round Wall

Trusses - Waiting for Installation

Roof Sheathing Prepared

Capital Crane

Crane Installing Trusses

Trusses

Trusses Installed - View from East

View from Road

Septic System Under Construction

Septic Tanks Installed

October 6-13, 2006

Side View of Deck

Keith Finishing the Deck

Dining Room Walls

Dining Room Walls

Garage Walls Framed

Garage Walls Sheathed

Art Niche by Master

Plates for Round Wall

Round Wall by Master Shower

Earlier Photos

Installing Floor Joists

Floor Sheeted

BCI Floor Joists in Place

Boise Laminated Structure Beams

Backfill

Water Truck for Backfill

Protected Perimeter Drain

Insulating Foam

Insulation Foam

Footings & Forms Being Laid Out

Footings & Forms Being Laid Out

Foundation Forms in Place

Look at That Pumper

Pumping Walls With Concrete

Shaping the Long, Long Driveway

The Driveway

The Driveway

The Driveway

The Driveway

Excavator in Place

Digging the Hole

More and More Digging

Placing Structural Fill

Almost Complete

Find us on Facebook  Join Us on Twitter  Kurowski Blog

Company Profile | Why Select KurowskiDream Homes | Homes and Sites Available
Environmental Commitment | Team Approach | What Others Are Saying | Summit County
Additions & Remodeling | Contact Us | Home | Privacy Policy

© 2010 KUROWSKI DEVELOPMENT CO.
To Make Your Dream Home a Reality: Contact Us
9200 West Cross Drive, Suite 319, Littleton, Colorado 80123
303.972.8680 fax: 303.972.3753  email: info@kurowski.com

 
  Certified Agining-In-Place SpecialistCertified Green Professional  Built Green ENERGY STAR Click to verify BBB accreditation and to see a BBB report.